Browse
Search
2012-358 Planning - NC Department of Transportation Grant Agreement (not final)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-358 Planning - NC Department of Transportation Grant Agreement (not final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 3:59:14 PM
Creation date
9/27/2012 4:46:31 PM
Metadata
Fields
Template:
Contract
Contract Starting Date
7/1/2012
Contract Ending Date
6/30/2013
Contract Document Type
Grant
Amount
$185,606.00
Document Relationships
2012-358 S Planning - NCDPT NC CTP Administrative Grant $0
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> designer coordinates the numerous prime contractors that are involved in the construction pnzmeoa. <br /> The Contractor may use design-bid-build procurements to implement its projects aftar it has complied <br /> with applicable Federal and State requirements and obtains approval from the Department prior to <br /> solicitation and award of the contract. <br /> S. . The Design-Build method of construction is where a single <br /> contractor is given responsibility for both design and cmnmtruotknn, thus eliminating an intermediate <br /> procurement step with possible time saving, and more effective coordination and opportunities for cost <br /> savings. Curnendy, this procurement method is not an allowable method of procurement by the State of <br /> North Carolina. The Contractor may request to use the design-build method as on "alternate" method. <br /> Submission of justification must be presented to the 81aba Building Commission fora 2/3-majority vote <br /> of approval. One of the drawbacks of design-build is that the owner does not have an independent <br /> source (the A/E in traditional construction) overseeing design implementation and verifying <br /> conformance with the drawings and specifications. <br /> t. . The connpcd|t|va proposal/ <br /> request for proposal (RFP) method of procurement is normally conducted with more than one source <br /> submitting an offer, i.e'. proposal. Either a fixed price or cost reimbursement type contract iaawarded. <br /> This method of procurement is generally used when conditions are not appropriate for the use of sealed <br /> bids. The Contractor acknowledges that certain restrictions apply under North Carolina law for use of <br /> the RFP method and these restrictions and exceptions are discussed below. <br /> (1) The Contractor agrees that the RFP Method may not be used in lieu of an <br /> invitation for bids UFB\for: <br /> /a Conntmction/napairwmrk; or <br /> . (b) Purchase of apparatum, mupp|ieo, rnotehm|m or equipment. See <br /> Subsection 14t(2). this &gneernent, regarding information technology <br /> goods aeservices. <br />� (2) The Contractor agrees that the F(FP method of solicitation may be used (in <br />� <br /> addition to or instead of any other procedure available under North Carolina law)for the procurement of <br /> information technology goods and services [as defined in N.C.G.8. 147-33.81/2D. This applies to <br /> electronic data processing goods and services, telecommunications goods and services, security goods <br /> and services, microprocessors, software, information processing, office systems, any services related <br /> to the foregoing, and consulting or other services for design or redesign of information technology <br /> supporting business processes. The Contractor will comply with the following minimum requirements <br /> (a) Notice of the request for proposals shall be given in accordance with <br /> (b) Contracts shall be awarded to the person or entity that submits the best <br /> overall proposal as determined by the awarding authority. Factors to be <br /> considered in awarding contracts shall be identified in the request for <br /> (c) The Contractor may use procurement methods set forth in <br /> N.C.G.S. 143-135.9 in developing and evaluating requests for proposals. <br /> (d) The Contractor may negotiate with any proposer in order to obtain a final <br /> contract that best meets the needs of the Contractor. <br /> (e) Any negotiations shall not alter the contract beyond the scope of <br /> the original request for proposals in a manner that deprives the <br /> proposers or potential proposers of a fair opportunity to compete for the <br /> contract; and would have resulted in the award of the contract to a <br /> different person or entity if the alterations had been included in the <br /> request for proposals. <br /> (f) Proposals submitted shall not be subject to public inspection until <br /> a contract is awarded. <br /> (3) The Contractor agrees that the RFP method, in accordance with FTA Circular <br /> 4220.1 F, under the guidelines of FTA "Best Practices Procurement Manual," should be used for <br /> procurements of professional services, such as consultants for planning activities and for transit system <br /> Updated 3/07/12 Page 18 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.