Orange County NC Website
Irerra an <br /> COST ESTIMATE <br /> Construction Materials Testing Services <br /> Walnut Grove Convenience Center Expansion <br /> Cedar Grove,North Carolina <br /> Proposal Number P70120381 <br /> SERVICES RATES C UNITS TOTAL <br /> Field and Laboratory Services <br /> Solls: <br /> Engineering Technician $40.00 par hour 10 days 8 hourstvisit so $3.200.00 <br /> Standard Laboratory Proctor $160.00 sample 2 samples 2 $320.00 <br /> Laboratory 200-wash testing $75.00 sample 2 samples 2 $150.00 <br /> Laboratory Atterberg testing $95.00 sample 2 samples 2 $190.00 <br /> Laboratory Moisture testing $10.00 sample 2 samples 2 $20.00 <br /> Trip Charges $moo hip 10 trips 10 so'bo <br /> Subtotal $3,880.00 <br /> Concrete: <br /> Enameering Technician $40.00 per hour 15 days 8 hours/visit 120 $4.800.00 <br /> Concrete Lab Compressive Strength testing $14.00 per cyl. 16 sets 4 cyl/set 64 $896.00 <br /> Trip Charges $0.00 trip 12 trips 121 $0.00 <br /> Subtotal $5,696.00 <br /> Foundations <br /> Engineering Technician $40.00 per hour 5 days 6 hours/visit 30 $1,200.00 <br /> Trip Charges $0.00 trip 5 tips 5 $0.00 <br /> Subtotal $1,200.00 <br /> Engineering&Report Review <br /> Project Engineer $115.00 per hour 6 hours 6 $660.00 <br /> Project Manager $95.00 per hour 12 hours 121 $1,140.00 <br /> Clerical $45,00 per hour 12 hours 12 $540,00 <br /> Subtotal $2,370.001 <br /> sommonsomigAmm- <br /> Total Estimated Cost: $13,146.00 <br /> loll <br />