Orange County NC Website
9 <br /> AREA OF COMMENTS: APPLICANT RESPONSE: <br /> CONCERN: <br /> Includes comments made during, <br /> and staff comments identified <br /> within the abstract for, the <br /> August 27, 2012 Quarterly Public <br /> Hearing <br /> LAND USE BUFFER BOCC members asked staff to Staff completed a site visit on <br /> Continued complete a field survey on an September 7, 2012 and determined <br /> adjoining residentially zoned the property is undeveloped. <br /> property to verify if it was <br /> undeveloped at this time. <br /> STORMWATER BOCC members wanted additional The site plan has been revised to <br /> Continued explanation from the applicant on denote the proposed stormwater <br /> the proposed stormwater management system. This system <br /> management system. has been deemed adequate by <br /> County Erosion Control staff. <br /> BOCC and Planning Board The site plan was revised to include <br /> members requested additional this detail. <br /> detail on the site plan denoting <br /> drainage points on the property. <br /> This request was made after the <br /> project engineer indicated the <br /> property would actually drain from <br /> multiple locations due to existing <br /> and proposed topography. <br /> BOCC members wanted additional Attachment 3 contains an e-mail <br /> written comments from Orange from Terry Hacket, Orange County <br /> County Erosion Control on the Erosion Control, signifying his review <br /> proposed stormwater system and and preliminary approval of the <br /> the appropriateness of runoff system. <br /> draining into existing ponds on the <br /> property, north of Mile Branch <br /> Road. <br />