Browse
Search
Agenda - 09-18-2012 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-18-2012 - Regular Mtg.
>
Agenda - 09-18-2012 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 9:59:01 AM
Creation date
9/14/2012 4:54:18 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes 09-18-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Attachment 1 <br /> Synopsis of review comments/concerns related to Darrell Chandler project - request to <br /> rezone a 12 acre portion of a 35.8 acre parcel of property to the NC Highway 57 <br /> Speedway Area Rural Economic Development Area (REDA-CZ-1) Conditional Zoning <br /> district. <br /> AREA OF COMMENTS: APPLICANT RESPONSE: <br /> CONCERN: <br /> Includes comments made during, <br /> and staff comments identified <br /> within the abstract for, the <br /> August 27, 2012 Quarterly Public <br /> Hearing <br /> TRANSPORTATION The turn radius for the access drive Turn radius has been increased to <br /> to the site is not adequate for address this concern. Orange <br /> County Planning staff turning movements of larger County staff met with the applicant <br /> comments were outlined vehicles, vehicles with trailers or on September 7, 2012 to review a <br /> at August 27, 2012 public emergency vehicles. revised plan calling for the increase <br /> hearing in turn radius around proposed <br /> storage buildings as well as the <br /> reduction in size of proposed <br /> buildings to ensure adequate travel <br /> way for vehicles. <br /> Drive-aisle, including those areas in Drive-aisle width has been increased <br /> between proposed units, are to 24 feet. The central drive-aisle <br /> insufficient to allow for two-way has been increased to 25 feet to <br /> traffic. accommodate Planning and <br /> Emergency Management staff <br /> One-way traffic is recommended recommendations. <br /> around the proposed storage units. <br /> The current location of the After reviewing pictures of the area <br /> entrance/exit is extremely close to where the proposed driveway shall <br /> the adjacent entrance for the be located (Refer to Attachment 2) <br /> cement plant and existing foliage Planning staff determined during the <br /> may obstruct drivers' view of on- September 7, 2012 meeting the drive <br /> coming traffic. location was acceptable. <br /> There appears to be insufficient The applicant has widened the <br /> stacking space for vehicles driveway entrance and increased the <br /> attempting to access the site. turn radius to accommodate <br /> additional stacking based on staff <br /> comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.