Browse
Search
Agenda - 09-18-2012 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-18-2012 - Regular Mtg.
>
Agenda - 09-18-2012 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 9:09:10 AM
Creation date
9/14/2012 4:49:03 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 09-18-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 5 <br /> 82 <br /> SMITI I MOORE <br /> September 6, 2012 <br /> Michael D. Harvey AICP, CFO, CZO <br /> Current Planning Supervisor <br /> Orange County Planning Department <br /> P. O. Box 8181 <br /> Hillsborough,NC 27278 <br /> Re: Special Use Permit Conditions— Strata Solar -White Cross Road Property <br /> Dear Michael: <br /> Thank you for sharing the draft special use permit conditions. The conditions set out <br /> below are acceptable to Strata Solar: <br /> (1) An exempt subdivision plat formally creating the boundaries of the utility site shall <br /> be submitted for the approval of the Planning Department and recorded within the <br /> Orange County Register of Deeds office within 180 days from the approval of the Special <br /> Use Permit. <br /> (2) As denoted on Sheet PV 2 of the approved site plan, the applicant shall cause a <br /> formal and detailed landscape and tree preservation plan to be submitted and approved by <br /> the Orange County Planning Department within 180 days from the approval of the <br /> Special Use Permit. <br /> (3) A revised Sheet PV 2 shall be submitted denoting the required for the project <br /> as required under Section 3.3 of the UDO. This revised sheet shall be submitted within <br /> 180 days from the approval of the Special Use Permit. <br /> (4) That the applicant complete and submit a formal application to the Orange County <br /> Inspections Department requesting authorization to commence construction of the <br /> proposed solar array. The application, including all applicable fees, shall be submitted <br /> within 180 days from the approval of the Special Use Permit. <br /> (5) That the Orange County Fire Marshal's office shall review and approve the final site <br /> plan as part of the normal building permit review process, and that any and all <br /> modifications be made to address fire code issues and access prior to the issuance of the <br /> permit authorizing the commencement of land disturbing activities. <br /> Elizabeth C.Trahos I Direct 919.755.8760 I Fax 919.838.3167 I beth.trahos @smithmoorelaw.com <br /> Smith Moore Leatherwood LLP • Attorneys at Law • www.smithmoorelaw.com <br /> 434 Fayetteville Street Two Hannover Square Suite 2800 PO Box 27525(27611) Raleigh,NC 27601 • 919.755.8700 <br /> Atlanta,GA • Charleston,SC • Charlotte,NC • Greensboro,NC • Greenville,SC • Raleigh,NC • Wilmington,NC <br />
The URL can be used to link to this page
Your browser does not support the video tag.