Orange County NC Website
64 <br /> NC STANDARD PPA.DOC(Revised November 1,2010) NCUC Docket No.E-100,Sub.127 <br /> 1 In the event that this contract is terminated by either Party prior to the expiration of the initial <br /> 2 term the Supplier will reimburse the Company for the total energy and capacity credits <br /> 3 received in excess of that which would have been received under variable rates,plus interest at <br /> 4 the rate of %per annum until repaid. <br /> 5 <br /> 6 5. Interconnection Facilities Charge. <br /> 7 <br /> 8 5.1 (a) In accordance with the provisions of the attached Rate Schedule, the Company will <br /> 9 furnish, install, own and maintain Interconnection Facilities, including protective devices, <br /> 10 metering equipment, etc. to permit parallel operation of the Supplier's facilities with the <br /> 11 Company's system. The Interconnection Facilities Charge, calculated in accordance with the <br /> 12 Extra Facilities Provisions of the Company's Service Regulations, to be paid by the Supplier <br /> 13 each month shall be $ , which is 1.7% of the installed cost of said Interconnection <br /> 14 Facilities,which amount is$ • [Metering shall be provided using the separately stated <br /> 15 Facilities Charge on Rate Schedule PP-__(NC)]. <br /> 16 <br /> 17 (b) The costs and charges set forth above shall be determined no later than twelve(12)months <br /> 18 prior to the installation of the Interconnection Facilities to reflect then current costs,conditions, <br /> 19 and service requirements. <br /> 20 <br /> 21 5.2 The monthly charge for the Interconnection Facilities to be provided under this Agreement is <br /> 22 subject to the rates, Service Regulations and conditions of'the Company as the same are now <br /> 23 on file with the Commission and may be changed or modified from time to time upon approval <br /> 24 by the Commission. Any such changes or modifications, including those which may result in <br /> 25 increased charges for the Interconnection Facilities to be provided by the Company, shall be <br /> 26 made a part of this Agreement to the same effect as if fully set forth herein. ' <br /> 27 <br /> 28 5.3 The Company shall furnish and install the Interconnection Facilities no later than the date <br /> 29 requested by Supplier for such installation. Supplier's obligation to pay the Interconnection <br /> 30 Facilities charges shall begin on the date that such Interconnection Facilities become <br /> 31 operational, except as provided in Paragraph 3.4 hereof, and such charges shall apply at all <br /> 32 times thereafter during the term of this Agreement, whether or not Supplier is actually <br /> 33 supplying electric power to the Company. <br /> 34 <br /> 35 5.4 The Interconnection Facilities under this agreement are only applicable for systems that <br /> 36 comply with the North Carolina Interconnection Procedures, Forms, And Agreements For <br /> 37 State-Jurisdictional Generator Interconnections(Interconnection Standard), which include <br /> 38 requirements for compliance with the following: <br /> 39 <br /> 40 1. The Institute of Electrical and Electronics Engineers (IEEE) P929 — "Recommended <br /> 41 Practice for Utility Interface of Photovoltaic Systems" (latest edition); and IEEE 1547 <br /> 42 "Standard for Interconnecting Distributed Resources with Electric Power Systems", latest <br /> 43 published edition. <br /> 44 <br /> 45 2. Underwriters Laboratories (UL) 1741 — "Standard for Static Inverters and Charge <br /> 46 Controllers for use in Photovoltaic Power Systems."(latest edition) <br /> 47 <br /> Page 4 of 12 <br />