Orange County NC Website
57 <br /> Duke Energy Carolinas,LLC Electricity No.4 <br /> North Carolina Tenth Revised Leaf No.92 <br /> Superseding North Carolina Ninth Revised Leaf No.92 <br /> SCHEDULE PP-H(NC) <br /> HYDROELECTRIC QUALIFYING FACILITIES <br /> PURCHASED POWER <br /> Variable Rate 5 Years 10 Years(a) 15 Years(a) <br /> b.All On-Ptak Energy per Off-Peak Month per kWh: <br /> i.Hydroelectric facilities with no storage capability 0.91 ¢ 0.94¢ 0,99¢ 1.03¢ <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 0.55 0 0.56¢ 0.59¢ 0.62 0 <br /> II. Energy Credit <br /> a.All On-Peak Energy per Month per kWh: 5.11 0 5.30¢ 6.11 ¢ 6.50¢ <br /> b.All Off-Peak Energy per Month per kWh: 3.98¢ 4.07 0 4.46¢ 4.67 0 <br /> Interconnected to Transmission System: Fixed Long-Term Rate(a) <br /> I. Capacity Credit Variable Rate 5 Years 10 Years(a) IS Years(a) <br /> a.All On-Peak Energy per On-Peak Month per kWh: <br /> i.Hydroelectric facilities with no storage capability 4.48¢ 4.63¢ 4.86¢ 5.07 0 <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 2.69¢ 2.78¢ 2.92 0 3.04¢ <br /> b.All On-Peak Energy per Off-Peak Month per kWh: <br /> i.Hydroelectric facilities with no storage capability 0.89 0 0.91 ¢ 0.96¢ 1.00 0 <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 0.53 0 0.55 0 0.58 0 0.60¢ <br /> II. Energy Credit <br /> a.All On-Peak Energy per Month per kWh: 4.98 0 5.17 0 5.95¢ 6.33¢ <br /> b:All Off-Peak Energy per Month per kWh: 3.89¢ 3.98¢ 4.36¢ 4.56¢ <br /> Option B <br /> Administrative Charge $ 8.17 per month <br /> Facilities Charge(if applicable-Sec Interconnection Facilities Charge) $ 8.03 per month <br /> Interconnected to Distribution System: <br /> Fixed Long-Term Rate(a) <br /> I. Capacity Credit Variable Rate 5 Years 10 Years(a) 15 Years(a) <br /> a.All On-Peak Energy per Summer Month per kWh: <br /> 1.Hydroelectric facilities with no storage capability 16.16¢ 16.68¢ 17.51 ¢ 18.28¢ <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 9.70¢ 10.01 ¢ 10.51 ¢ 10.97¢ <br /> b.All On-Peak Energy per Non-Summer Month per <br /> kWh: <br /> 1.Hydroelectric facilities with no storage capability 2.50 0 2.58¢ 2.71 ¢ 2.83¢ <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 1.50¢ 1.55 0 1.63¢ 1.70¢ <br /> H. Energy Credit <br /> a.Ail On-Peak Energy per Month per kWh: 5.37 0 5.54¢ 6.36¢ 6.78¢ <br /> b.All Off-Peak Energy per Month per kWh: 4.29¢ 4.40¢ 4.94 0 5.20¢ <br /> Interconnected to Transmission System: <br /> Fixed Long-Term Rate(a) <br /> I. Capacity Credit Variable Rate 5 Years 10 Years(a) 15 Years(a) <br /> a.All On-Peak Energy per Month per kWh: <br /> i.Hydroelectric facilities with no storage capability 15.76 0 16.26¢ 17.07¢ 17.83¢ <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 9.45¢ 9.76¢ 10.25 0 10.70¢ <br /> b.All On-Peak Energy per Non-Summer Month per kWh: <br /> i.Hydroelectric facilities with no storage capability 2.44¢ 2.52¢ 2.64¢ 2.76¢ <br /> and no other type generation <br /> ii.for all other hydroelectric facilities 1.46¢ 1.5I 0 1.58¢ 1.66¢ <br /> North Carolina Tenth Revised Leaf No.92 <br /> Effective for service on and after August 26,2011 <br /> NCUC Docket No.E-I 00,Sub 127,Order dated July 27,2011 <br />