Browse
Search
Agenda - 09-18-2012 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-18-2012 - Regular Mtg.
>
Agenda - 09-18-2012 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 9:09:10 AM
Creation date
9/14/2012 4:49:03 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 09-18-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 <br /> • I <br /> NC STANDARD PPA:DOC(Revised November 1,2008) NCUC Docket No.E-100,Sub. 127 <br /> 1 PURCHASED POWER AGREEMENT <br /> 2 <br /> 3 THIS PURCHASED POWER AGREEMENT("Agreement")is made <br /> 4 this 8th day of May,2012,by and between <br /> 6 DUKE ENERGY CAROLINAS,LLC, <br /> 7 <br /> 8 a North Carolina Limited Liability Company("Company"),and <br /> 9 <br /> 10 WHITE CROSS FARM,LLC, <br /> 11 <br /> 12 ("Supplier"or"Customer"),for the <br /> 13 <br /> 14 "White Cross Farm PV Installation", <br /> 15 <br /> 16 which is or will be a qualifying facility as defined by the Federal Energy Regulatory Commission <br /> 17 ("FERC")pursuant to Section 210 of the Public Utility Regulatory Policies Act of 1978, consisting <br /> 18 of five(5) - 1,276.8 kilowatt DC Astronergy photovoltaic arrays (6,384 kilowatts DC total) and ten <br /> 19 (10) SMA SC500U grid-tie inverters, (the "Facility"), located at 2159 White Cross Road, Chapel <br /> 20 Hill,NC 27516. <br /> 21 <br /> 22 (Hereinafter,the parties are also referred to individually as"Party"and collectively as"Parties"). <br /> 23 <br /> 24 In consideration of the mutual covenants herein contained,the Parties hereto, for themselves,their <br /> 25 successors and assigns,do hereby agree to the following: <br /> 26 <br /> 27 1. Service Requirements. <br /> 28 <br /> 29 1.1 The Supplier shall sell and deliver exclusively to the Company all of the electric power <br /> 30 generated by the Facility, net of the Facility's own auxiliary electrical requirements, and the <br /> 31 Company shall purchase, receive, use and pay for the same, subject to the conditions <br /> 32 contained in this Agreement. If the Supplier will receive back-up and maintenance power for • <br /> 33 the Facility's auxiliary electrical requirements from the Company, such power shall be <br /> 34 provided to Supplier pursuant to a separate electric service agreement under the Company's <br /> 35 rate schedule appropriate for such service. <br /> 36 <br /> 37 1.2 The electric power to be delivered hereunder shall be three (3) phase, alternating, at a <br /> 38 frequency of approximately sixty(60)hertz,and at approximately 12,470/7,200 volts. <br /> 39 <br /> 40 1.3 Delivery of said power shall be made in Orange County at or near Chapel Hill,North Carolina <br /> 41 at a delivery point described as follows: At the solar farm located at 2159 White Cross Road, <br /> 42 Chapel Hill,NC 27516,where the Customer's conductors connect to the Company's installed <br /> 43 tap line conductors. <br /> 44 <br /> 45 1.4 (a) The Nameplate Capacity of the Supplier's generating facilities, as defined in the attached <br /> 46 Schedule PP-N(NC) is 5,000 kilowatts, consisting of five (5) - 1,276.8 kilowatt DC <br /> Page 1 of 12 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.