Orange County NC Website
27 <br /> 1 the staff report and associated attachments be incorporated into the record. Is that acceptable <br /> 2 to the Board? It was answered yes. Thank you very much. So at this time I'll call Phil Post, our <br /> 3 engineer. <br /> 4 <br /> 5 Phillip Post: Members of the Commissioners and members of the Planning Board, my name is <br /> 6 Phil Post. I reside in Chapel Hill. I've been properly sworn. I've been an engineer in Chapel <br /> 7 Hill for over 33 years. I'm really happy to be associated with the Bradshaw property, and <br /> 8 particularly this element of the development property. This is White Cross Road here. The <br /> 9 entire parcel is 122 acres. The Strata project will occupy about 53 acres. The Bradshaw Mobile <br /> 10 Acres is here, that will continue to operate as it has for residential purposes. The array will be in <br /> 11 this area. The stream buffers, these hashed areas represent the area of the stream buffer that <br /> 12 the County and we agree is the protected stream buffer area. The other piece that we have on <br /> 13 this is the Type E 75-foot buffer that we're proposing around the entire perimeter of the project. <br /> 14 It doesn't include of course the right-of-way. It does not include the power line; it's in addition to <br /> 15 that. I'll just point out a few features of our proposed plan here. There is one part of the <br /> 16 Bradshaw Mobile Acres; most of it is really heavy, nice, old hardwood. There is one area that is <br /> 17 sort of a lawn area, so we're going to have an alternative buffer right here. That's why there's a <br /> 18 discontinuation. We'll still have a Type E buffer, but it will be planted in a slightly different way <br /> 19 and a little more intense and narrow buffer. <br /> 20 <br /> 21 Our proposed driveway is here. It will be a gravel drive directly opposite to the existing gravel <br /> 22 residential driveway on the opposite side of White Cross. There will be a small gravel area here <br /> 23 where the array materials and construction materials will be deposited as it's being erected. <br /> 24 That will be a permanent sort of parking area with the gate right here. As Michael has told you, <br /> 25 the array really rests off the ground, so underneath the array would be grass. It will really be a <br /> 26 grass field with the raised arrays on it. The only feature that is kind of different about it, is the <br /> 27 little square places right here, and I think there's five of them. There will be sort of some <br /> 28 electrical equipment that will gather the electricity that is generated by these solar panels so that <br /> 29 it can be converted from DC power to AC power, and then distributed back to Duke Power. I'm <br /> 30 really pleased to be associated with a project of this type because I think it provides so many <br /> 31 benefits to our County and particularly in advancing the environmental goals, not only of the <br /> 32 Board, but of the County Comprehensive Plan. There are many citizens in Orange County that <br /> 33 would like to see us be less dependent on fossil fuel and more dependent on sustainable <br /> 34 renewable energy. This is a project that will produce electricity and be able to support about <br /> 35 750 homes. My colleagues will explain a little bit more about the exact benefits that are derived <br /> 36 from this. I just want to point out that it will be a tremendous investment in the County and will <br /> 37 provide very little pressure or new addition to the County services. In other words, there won't <br /> 38 be any new school children, there won't be any new school buses, there's no new traffic, there's <br /> 39 no water needs, there's no sewer needs, there's no additional refuse removal, there's no need <br /> 40 for any emergency services. It provides a nice investment in the County with virtually no impact <br /> 41 on any County services. So I'd like to point that out as being not only an advancing our <br /> 42 environmental goals but also just being a nice positive addition to our County. <br /> 43 <br /> 44 This application we believe meets all of the requirements of Section 2.7 of the UDO. We <br /> 45 therefore ask for your support. We further note the objective, the specific objectives in the <br /> 46 County Comprehensive Plan regarding sustainable energy and reduction of carbon footprint. <br /> 47 We believe that this project will take some giant steps in those directions. I'll stop there and <br /> 48 answer any questions. <br /> 49 <br /> 50 Chair Pelissier: Yes, could you tell us a little bit more about the power line that would be <br /> 51 installed there and where are the other power lines that it's going to hook up to? <br />