Orange County NC Website
23 <br /> RECOMMENDATION: <br /> Staff has not received any information that would establish grounds for making a negative finding on the general <br /> standards. These standards include maintaining or promoting the public health, safety, and general welfare, <br /> maintaining or enhancing the value of contiguous property, and the use being in compliance with the general plan <br /> for the physical development of the County. <br /> Staff has reviewed the application, the site plan, and all supporting documentation and has found that the <br /> applicant complies with the specific standards and required regulations as outlined within the UDO. <br /> Provided the Planning Board and the Board of County Commissioners finds in the affirmative on the specific and <br /> general standards, the Board could make a positive finding on this application. In the event that the Planning <br /> Board makes the determination that the permit can be issued, Planning Staff recommends the attachment of the <br /> following conditions to the Special Use Permit: <br /> (1) An exempt subdivision plat formally creating the boundaries of the utility site shall be submitted for the <br /> approval of the Planning Department and recorded within the Orange County Registrar of Deeds office <br /> within 180 days from the approval of the Special Use Permit. <br /> (2) As denoted on Sheet PV 2 of the approved site plan, the applicant shall cause a formal and detailed <br /> landscape and tree preservation plan shall be submitted and approved by the Orange County Planning <br /> Department within 180 days from the approval of the Special Use Permit. <br /> (3) A revised Sheet PV 2 shall be submitted denoting the required Pedestrian/Landscape Ratio for the <br /> project as required under Section 3.3 of the UDO. This revised sheet shall be submitted within 180 days <br /> from the approval of the Special Use Permit. <br /> (4) That the applicant complete and submit a formal application to the Orange County Inspections <br /> Department requesting authorization to commence construction of the proposed solar array. The <br /> application, including all applicable fees, shall be submitted within 180 days from the approval of the <br /> Special Use Permit. <br /> (5) That the Orange County Fire Marshal's office shall review and approve the final site plan, as part of the <br /> normal building permit review process, and that any and all modifications be made to address fire code <br /> issues and access prior to the issuance of the permit authorizing the commencement of land disturbing <br /> activities, <br /> (6) That prior to the commencement of land disturbing activity the applicant shall submit all necessary <br /> stormwater, grading plans, and erosion control applications to the Orange County Erosion Control <br /> Department for review and processing. These applications shall be submitted within 180 days from the <br /> issuance of the SUP. <br /> (7) That the applicant shall submit the approved site plan to NC DOT for review and comment. In the event it <br /> is determined that the applicant is required to apply for, and receive a, driveway permit from NC DOT to <br /> allow for the project to be developed, the applicant shall submit all necessary applications as required by <br /> NC DOT within 180 days from the issuance of the SUP and provide planning staff with a copy of the <br /> issued permit. <br />