Browse
Search
Agenda - 09-18-2012 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-18-2012 - Regular Mtg.
>
Agenda - 09-18-2012 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 9:09:10 AM
Creation date
9/14/2012 4:49:03 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 09-18-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> SECTION 5.9.3 PUBLIC UTILITY STATIONS AND SUBSTATIONS ("Yes" indicates compliance; <br /> "No" indicates non-compliance) <br /> PLANNING <br /> STAFF EVIDENCE SUBMITTED PLANNING <br /> Ordinance RECOMMENDED TO SUPPORT BOARD <br /> Requirements FINDINGS FINDINGS FINDINGS <br /> Section 5.9.3 of the UDO <br /> establishes additional <br /> submittal requirements <br /> and standards of <br /> evaluation for a public <br /> utility <br /> 5.9.3 (A) (1) <br /> In addition to the <br /> information required by <br /> Section 2.7, the following <br /> shall be submitted as part <br /> of the application: <br /> 5.9.3 (A) (1) (a) X Yes No A site plan was Yes No <br /> submitted as required. <br /> A site plan showing all Sheet PV 2 of the site <br /> existing or proposed plan contains the <br /> buildings, storage areas, required information <br /> parking and access areas, <br /> topography, any officially <br /> designated floodplains or <br /> alluvial soils. <br /> 5.9.3 (A) (1) (b) X Yes No The submitted site plan, Yes No <br /> specifically Sheet PV1, <br /> Plans and elevations for contains the elevations <br /> all proposed structures of the proposed arrays. <br /> and descriptions of the <br /> color and nature of all Sheet PV 2 indicated no <br /> exterior materials buildings are proposed <br /> for the site <br /> 5.9.3 (A) (1) (c) X Yes No The submitted site plan, Yes No <br /> specifically Sheet PV2, <br /> Landscape Plan, at the contains some of the <br /> same scale as the site required information <br /> plan, showing existing and focusing primarily on the <br /> proposed trees, shrubs, existing foliage. <br /> ground cover and other <br /> landscape materials. Staff recommends a <br /> condition of approval be <br /> the submission of a <br /> formal landscape plan <br /> prior to the <br /> commencement of earth <br /> disturbing activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.