Browse
Search
Agenda - 09-18-2012 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-18-2012 - Regular Mtg.
>
Agenda - 09-18-2012 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 11:54:29 AM
Creation date
9/14/2012 4:33:59 PM
Metadata
Fields
Template:
BOCC
Date
9/17/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5h
Document Relationships
2013-220 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 09-18-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 18, 2012 <br /> Action Agenda <br /> Item No. 5-h <br /> SUBJECT: Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane <br /> EDD Water and Sewer Extension Project— Phase 2 <br /> DEPARTMENT: Planning PUBLIC HEARING: (Y/N) N <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Original Hobbs, Upchurch & Associates Craig Benedict, Planning Director, 245- <br /> Contract, including Amendment#1 2592 <br /> Kevin Lindley, PE, Staff Engineer, 245- <br /> 2. Contract Amendment#3 <br /> 2583 <br /> a. Original Buckhorn-Mebane Bidding and <br /> Construction Management Proposal <br /> b. Revised Construction Management and <br /> Inspection Costs <br /> 3. Map of Project Area <br /> a. Water <br /> b. Sewer <br /> PURPOSE: To approve Contract Amendment #3 to the Hobbs, Upchurch & Associates (HUA) <br /> contract for design of water and sewer utilities in the extended Efland-Buckhorn-Mebane <br /> Economic Development District (EDD) area. <br /> BACKGROUND: This amendment will add construction-phase engineering management, <br /> contract administration and inspection to the original contract. Orange County contracted with <br /> HUA in November 2010 to provide design and permitting for water and sewer infrastructure in <br /> the Buckhorn EDD area (Attachment 1). <br /> On August 3, 2012, HUA sent Orange County a proposal for bid coordination, construction <br /> management and inspection for the Buckhorn-Mebane Phase 2 Utilities project (Attachment 2a <br /> included to describe the scope of work proposed). The BOCC approved Contract Amendment <br /> #2.1 to add the bid coordination portion of this proposal to HUA's original contract at the <br /> September 6, 2012 regular meeting. At that time, County staff was still in negotiation regarding <br /> the construction administration and inspection portion of the HUA proposal. The result of this <br /> negotiation was a reduced anticipated construction administration cost, which is shown in <br /> Attachment 2b, and will replace the amounts shown in Attachment 2a for construction <br /> administration and inspection. <br /> As a summary, the following is the list of amendments and amounts for this contract to date: <br /> Original contract (11/2010) $192,000 <br /> Gravity design option $ 8,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.