Browse
Search
Agenda - 09-06-2012 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-06-2012 - Regular Mtg.
>
Agenda - 09-06-2012 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:53:41 PM
Creation date
9/11/2012 10:39:11 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 09-06-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> Hogan -Rogers Hosue Minimum Restoration Costs <br /> Blake Moving Company,Inc submits the following estimat for the relocation of <br /> the I-logan-Rogers home on Furefoy Drive.This estimate also includes site prep, <br /> footing,foundations,remodeling costs and additions. <br /> L Relocation- Includes all prep work to prepare the dwelling for relocation. <br /> Relocation of the home with the home being left in a level positon over a footing at <br /> basement height. $39,860.08 <br /> 2.Grading for the route-Includes placement of a 2 foot pipe in a drain ditch. <br /> Placing compactable fill over the pipe and adjacent area.Removal of debris from <br /> the route and existing site,including back room,trees,and foundation debris. <br /> $11,160.00 <br /> 3.Excavation of topsoils at new site. Furnishing cosupactable fill to raise the house <br /> site up to 2.5 feet. Compacting fill including engineering fees 021,230.00 <br /> 4.Footings,foundations,basement slab-Footings width%`,depth l8"(includes <br /> horizonal rebar).Foundations include a 12"reinforced wall on the front and sides. <br /> Porch includes foundation from basement depth due to compaction issues and <br /> relocation process.Front sidewalks included.French drains and waterproofing. <br /> $60,243.00 <br /> 5.Backfill of topsoil against front and side walls.Side slopes to be tapered. <br /> $5,250.00 <br /> 6.Remove back porch,Removal of debris included in#2. Remove vinyl siding, <br /> Remove shingle siding.Putty all nail holes,repair lap siding,repair improper <br /> framing. $65,000.80 <br /> Total minimum restoration costs $202,743 <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.