Browse
Search
Agenda - 09-06-2012 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-06-2012 - Regular Mtg.
>
Agenda - 09-06-2012 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:53:41 PM
Creation date
9/11/2012 10:39:11 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 09-06-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Cost estimate Summary: <br /> Engineering, Design and Permitting 376,350 <br /> Construction Cost 3,763,506 <br /> Construction Administration 188,175 <br /> Construction Inspection 188,175 <br /> 20%Contingency 903,241 <br /> Sub Total 5,419,447 <br /> Service Availability Fees 368,768 <br /> Total 5,788,215 <br /> The concept does not include the cost to actually connect individual homes to the sewer <br /> system. Those costs will vary on the configuration of the lot and the distance from the <br /> house to the main sewer line. Those costs are typically the costs of the homeowner <br /> and are estimated to be about $20/foot. The connections to an individual house would <br /> be provided by a private plumbing contractor. <br /> The next step to move the concept plan forward would be to begin the preliminary <br /> engineering and design work. Engineers would be hired to take this concept, go out in <br /> the field and start the process of data collection and defining the details of the concept. <br /> OWASA has estimated the preliminary engineering costs would be $376,350. That is a <br /> rough estimate based on what is known of the area so far. A completed preliminary <br /> engineering and design will be necessary to complete a Community Development Block <br /> Grant application. <br /> Sewer Recommendations: <br /> The Task Force has discussed all or part of the proposed $5.8 million dollar sewer <br /> concept plan, but has not yet recommended moving forward with this concept plan, <br /> pending an agreement on a cost sharing plan for sewer improvements. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.