Browse
Search
Agenda - 09-06-2012 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-06-2012 - Regular Mtg.
>
Agenda - 09-06-2012 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:53:41 PM
Creation date
9/11/2012 10:39:11 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 09-06-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> be considered, if the entire concept project is not feasible. The sewer infrastructure <br /> routing was estimated based on the topography taken from maps rather than from any <br /> field work. In order to get to a greater level of detail or certainty on the cost, some field <br /> work would be required. There are two brown areas on the map that the County has <br /> identified as some subsurface disposal or some suspected contamination. Without any <br /> further investigation, the sewer line has been routed no closer than 100 feet of that <br /> margin. <br /> Historic Rogers Road Area Sewer Concept_, <br /> May 2012 _ ° N. ��� __:i;y�� <br /> 1 i // -_ I ,_jr--. am;_ <br /> I ` Parcels Cost Per r <br /> �"� _ Area Total Cost Served Parcel r �' O 1 $468,780 2 <br /> $234,390 ` <br /> 2 $786,234 6 $131,039 <br /> 1 I I i �� _ 3 $106,313 1 <br /> $106,313 <br /> 4 $546,860 8 $68,357 [ <br /> 1 5 $826,022 17 $48,590 <br /> ® _ (0...r?a mr 6 $848,919 5 $ (►, <br /> �� I 169,784 <br /> I 7 $349,191 2 $174,596 <br /> Ti 'J t-; 8 $1,855,900 45 $41,242 1 <br /> 11I C_: J _+-' <br /> 1- , 6.1 n Total $5,788,217 86 $67,305 f <br /> H MA <br /> at .111 7 �/ <br /> 11-- <br /> - creme tteci <br /> `� (JON10wnersMp, /� a. . �� <br /> _t_i \ id._ pG <br /> \— <br /> 1I H- <br /> © )uma. ,\ 1-1 ® 4S'.�i�=•1,'�ice*.;3,IL-64- le ,-_-_:_\ <br /> 1 7 i 1 ®//I7m - s..rib nfii e4 ,pb <br /> Lill. __1 II 1 - --1 -' 41•64 V_,/ ■ <br /> 0 3W M. <br /> mo d .. ', <br /> . \ ! 6• i <br /> The total construction and installation cost for the concept level sewer is approximately <br /> $5.8 million. See the table below. It would serve 86 additional parcels of land. The <br /> concept costs include construction, engineering design, administrative and contingency <br /> for possible rock. The topography of the neighborhood is complex and the land falls in <br /> several different directions. This concept plan does not include the costs of any property <br /> acquisitions or easement acquisitions. The availability hookup charge for each of the <br /> parcels is based on an assumed average house size of 2,500 square feet. When a <br /> customer connects to the OWASA water and sewer system, there is a one-time fee that <br /> is estimated to be $4,300 for the concept plan. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.