Orange County NC Website
Comparison Table of Land Use Element/Map <br /> Orange County vs. Durham City-County <br /> Orange County Durham City-County <br /> 10-year Transition: Zoning Districts: Density: Residential: Zoning Districts: Density: <br /> Lands located in areas that are in the • R1 • 1 DU/acre Land designated for buildings • RS-20 • 2 DU/acre <br /> process of changing from rural to • R2 • 2 DU/acre consisting only of dwelling units. • RS-10 • 3 DU/acre <br /> urban densities and/or intensities, • R3 • 2.9 DU/acre • Very Low Density(2 DU/acre) • RS-8 • 5 DU/acre <br /> that are suitable for higher • R4 • 4.3 DU/acre • Low Density(4 DU/acre) • RS-5 • 8-10 DU/acre <br /> densities/intensities and could be • R5 • 5.8 DU/acre <br /> provided with public utilities and • R8 • 8.7 DU/acre <br /> services within the first 10-year • R13 • 14.5 DU/acre <br /> phase of the Plan update or where <br /> such utilities are services are already <br /> present or planned.Non-residential rt <br /> rr <br /> uses implemented in accordance *Information from *information from Durham P) <br /> n <br /> with small area plans and/or overlay Durham Unified Unified Development <br /> *Information from 2030 *information from *Information from Durham Comprehensive districts may be appropriate. P Development Ordinance,Article 6.3 <br /> ment Comprehensive Plan, Orange County UDO, (D <br /> *Information from 2030 Comprehensive Plan, Plan,Chapter 2,Land Use Element, Ordinance,Article 4.2.2, Residential Suburban <br /> Appendix F:Land Use Article 3 Development Teir,pg 2-18&19; Chapter 18 Residential Suburban Development rt <br /> Chapter 5:Land Use Element,Section 5.3,pg and Zoning Matrix,pg.F- <br /> 5-15. Appendices,pg.8-12 Density <br /> 3 <br /> Lo <br /> Economic Development: Zoning Districts: Density: Industrial: Zoning Districts: Density: <br /> Land in transition areas of the • EDE-1 • No requirement. The manufacture, production,and • Industrial • 30,000/sq.ft. <br /> County which has been specifically • EDE-2 Density based processing of consumer goods. • Industrial Light • 25,000/sq.ft. <br /> targeted for economic development compliance with Industrial is often divided into <br /> activity consisting of light industrial, site ratio "heavy industrial" uses,such as <br /> distribution,office,service/retail requirements. construction yards,quarrying,and <br /> uses and flex space(typically one • Open space, factories;and "light industrial" <br /> story building designed,constructed, floor area, uses,such as research and <br /> and marketed as suitable for use as ped/landscaping development and less intensive <br /> offices but able to accommodate warehousing and manufacturing. <br /> other uses such as a warehouse, <br /> showroom, manufacturing, <br /> assembly,or similar operations). <br /> Such areas are located adjacent to <br /> interstate and major arterial <br /> highways,and subject to special *Information from 2030 *Information from *Information from Durham <br /> design criteria and performance Comprehensive Plan, Durham Unified Unified Development <br /> Appendix F:Land Use *Information from Durham Comprehensive Development Ordinance,Article 6.10, <br /> standards. *Information from Plan,Chapter 2,Land Use Element, Nonresidential District <br /> and Zoning Matrix,pg.F- Ordinance,Article 4.3.6 <br /> 'Information from 2030 Comprehensive Plan, 3 Orange County UDO, Development Teir,pg 2-18&19; Chapter 18 and 4.3.7, Development Intensity <br /> Chapter5:Land Use Element,Section 5.3,pg Article 3 Appendices,pg.8-18 Nonresidential District rn <br /> 5-16. <br />