Orange County NC Website
21 <br /> ' Hobbs Upchurch Associates <br /> i., ,,,,„10 1 s. <br /> Buckhorn-Mebane EDD Phase 2 <br /> Sewer Improvements to serve the Efland Community <br /> Orange County, NC <br /> Preliminary Cost Estimate <br /> Item Quantity Unit Price Extended Cost <br /> 10-inch SDR 35 Sanitary Sewer 2,300 If $60,00 $138,000.00 <br /> 10-inch DI Sanitary Sewer 300 If $75.00 $22,500.00 <br /> 4-foot Diameter Manhole 10 ea $2,750,00 $27,500.00 <br /> 8" PVC SDR 21 Forcemain 1,400 If $18.00 $25,200.00 <br /> 8" CL 250 DI Forcemain 360 If $35.00 $12,600.00 <br /> 10" PVC SDR 21 Forcemain 6,950 If $22.00 $152,900.00 <br /> 10"CL 250 DI Forcemain 500 ea $50.00 $25,000.00 <br /> 10" ID HDPE Installed by Directional Bore 1,750 If $450.00 $787,500.00 <br /> 16"Steel Casing Installed by Bore&Jack 280 If $200.00 $56,000.00 <br /> 20"Steel Casing Installed by Bore &Jack 380 If $250.00 $95,000.00 <br /> 20"Steel Casing Installed on Grade by Bore& <br /> 60 If $350.00 $21,000.00 <br /> Jack <br /> Tie to Existing Forcemain 1 Is $3,000.00 $3,000.00 <br /> Existing Pump Station Modifications 1 Is $75,000.00 $75,000.00 <br /> Duplex Submersible Pump Station 1 Is $195,000,00 $195,000.00 <br /> Standby Emergency Generator 1 Is $60,000.00 $60,000.00 <br /> Clearing 2.25 ac $4,000.00 $9,000.00 <br /> Select Fill 1,500 cy $20.00 $30,000.00 <br /> Asphalt open cut&Patch 240 sy $50,00 $12,000.00 <br /> Concrete Drive Removal&Replacement 25 sy $350.00 $8,750.00 <br /> Seed Mulch &Erosion Control , 8.50 ac $3,000.00 $25,500.00 <br /> Total Estimated Construction Cost: $1,781,450.00 <br /> Construction Contingency: $178,145.00 <br /> Survey: $18,000.00 <br /> Engineering Design: $133,600.00 <br /> Construction Administration& Inspection: $115,800.00 <br /> R/R Encroachment $25,000.00 <br /> Easement Acquisition $10,000.00 <br /> Permits $2,000.00 <br /> Total Estimated Project Cost: $2,263,995.00 <br /> T:910,692.5618 I F:910.892.7342 I 300 SW BROAD STREET I SOUTHERN PINES,NC 28387 I WWW.HOBBSUPCHURCH.COM <br /> SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />