Browse
Search
Agenda - 09-06-2012 - 5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-06-2012 - Regular Mtg.
>
Agenda - 09-06-2012 - 5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:09:58 PM
Creation date
9/11/2012 10:19:38 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
2012-133 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 09-06-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2B 20 <br /> I-1(6os Upchurch Associates <br /> °lig noni'ingl i p 8nrung surveying <br /> August 3, 2012 <br /> Mr. Craig Benedict <br /> Orange County Planning & Inspection <br /> 131 W. Margaret Lane <br /> Hillsborough,NC 27278 <br /> RE: Efland Sewer System <br /> Re-Routing Sewer Discharge to Gravelly Hill <br /> Engineering Design Services Proposal <br /> Dear Mr. Benedict: <br /> Per our previous discussions, and in accordance with our preliminary engineering report for the <br /> Buckhom-Mebane EDD project, HUA offers to provide engineering design services for the <br /> above referenced project. Our design services shall adhere to the conditions, expectations, and <br /> level of service as noted in our original contract with Orange County dated November 4, 2010. <br /> Following is a summary of the proposed costs: <br /> Surveying $18,000.00 <br /> Engineering Design $133,600.00 <br /> Please find attached a copy of the detailed estimate and layout map for the proposed project. <br /> Upon execution of an amendment to our contract to complete this work, we will schedule a <br /> meeting to review the previously completed report, all the latest Efland design information, and <br /> develop a detailed work schedule. <br /> If you should require additional information, or wish to discuss the project further, please do not <br /> hesitate to contact this office. <br /> Sincerely, <br /> HOBBS,UPCHURCH&ASSOC,: e;c t <br /> �/ <br /> E • <br /> •. os 9 <br /> a SEAL <br /> 17651 <br /> = <br /> Bill Lester, Jr., <br /> ' <br /> "iii ESTE'\' <br /> 1:910,692.5618 1 F;910.692.7342 ( 300 SW BROAD STREET 1 SOUTHERN PINES,NC 28387 1 WWW.HOBBSUPCHURCH.COM <br /> SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.