Orange County NC Website
19 <br /> Buckhorn - Mebane EDD Sewer Improvements Phase 2 <br /> Orange County,NC <br /> Preliminary Cost Estimates (Revised 8-2-12) <br /> Sewer Improvements Segment 3:Pump Station and Line FM-1 <br /> Description of Item Quantity Unit Unit Price Extended Price <br /> 10" PVC SDR 21 Force Main 12,258 LF $25.00 $306,450.00 <br /> 10" D.I.P. Force main 390 LF $50.00 $19,500.00 <br /> 10" Restrained Joint D.I.P. 100 LF $75.00 $7,500.00 <br /> 12" HDPE Directional Bore 180 LF $90.00 $16,200.00 <br /> 10" 90 Degree Bend 4 EA $500.00 $2,000.00 <br /> 10" 45 Degree Bend 3 EA $425.00 $1,275.00 <br /> 10" 22.5 Degree Bend 1 EA $425.00 $425.00 <br /> 10" Gate Valve 6 EA $1,500.00 $9,000.00 <br /> Combination Air Release Valve Assembly in Manhole 4 EA $2,500.00 $10,000.00 <br /> Pump Station/Site Work 1 LS $235,000.00 $235,000.00 <br /> Permanently Mounted Generator 1 LS $60,000.00 $60,000.00 <br /> Emergency Pump Connection 1 LS $3,000.00 $3,000,00 <br /> 20" Steel Casing(Bored&Jacked) 390 LF $400.00 $156,000.00 <br /> Gravel for Driveways 371 TN $22.00 $8,162.00 <br /> Asphalt Open Cut and Patch 40 SY $39.00 $1,560.00 <br /> Tie to Existing Manhole 1 EA $1,300.00 $1,300.00 <br /> Seed&Mulch&Erosion Control 7.3 AC $3,500.00 $25,550.00 <br /> Subtotal Construction Cost $862,922.00 <br /> Construction Contingency $87,000.00 <br /> Construction Administration/Inspection $52,000.00 <br /> Total Project Cost $1,001,922.00 <br />