Orange County NC Website
16 <br /> Buckhorn- Mebane EDD Water Improvements Phase 2 <br /> Orange County, NC <br /> Preliminary Cost Estimates (Revised 8-2-12) <br /> Water Improvements:Lines W-1, W-2, and W-3 <br /> Item Description Quantity Unit Unit Price Extended Price <br /> 16" D.I.P. Water Main 12,568 LF $60.00 $754,080.00 <br /> 16" Restrained Joint D.I.P 571 LF $100.00 $57,100.00 <br /> 18" HDPE Directional Bore 882 LF $120.00 $105,840.00 <br /> 12" D.I.P. Water Main 2,267 LF $45.00 $102,015.00 <br /> 16"x12" Reducer 4 EA $500.00 $2,000.00 <br /> 16" 90 Degree Bend 5 EA $600.00 $3,000.00 <br /> 16" 45 Degree Bend 12 EA $550.00 $6,600.00 <br /> 16" 22.5 Degree Bend 7 EA $550.00 $3,850.00 <br /> 12" 90 Degree Bend 2 EA $550.00 $1,100.00 <br /> 12" 45 Degree Bend 2 EA $535.00 $1,070.00 <br /> 16"x12" Tee 1 EA $650.00 $650.00 <br /> 16"x6" Tee 10 EA $650.00 $6,500.00 <br /> 12"x12" Tee 1 EA $625.00 $625.00 <br /> 12"x6" Tee 2 EA $600.00 $1,200.00 <br /> 16" Gate Valve 18 EA $2,000.00 $36,000.00 <br /> 12" Gate Valve 8 EA $1,750.00 $14,000.00 <br /> 6" Gate Valve 12 EA $1,000.00 $1 2,000.00 <br /> Fire Hydrant Assembly 12 EA $2,000.00 $24,000.00 <br /> Combination Air Release Valve Assembly 2 EA $2,500.00 $5,000.00 <br /> 32" Steel Casing(Bored &Jacked) 330 LF $400.00 $132,000.00 <br /> 24" Steel Casing(Bored&Jacked) 100 LF $375.00 $37,500.00 <br /> Gravel for Driveways 296 TN $25.00 $7,400.00 <br /> Asphalt Open Cut and Patch 75 SY $50.00 $3,750.00 <br /> Concrete Open Cut and Patch 50 SY $60.00 $3,000.00 <br /> Tie to Existing Water Main 2 EA $3,000.00 $6,000.00 <br /> Stream Crossing(Type 1) 1 LS $3,500.00 $3,500.00 <br /> Clearing and Grubbing 3.2 AC $4,000.00 $12,800.00 <br /> Seed, Mulch, &Erosion Control 6.0 AC $3,500.00 $21,000.00 <br /> Subtotal Construction Cost $1,363,580.00 <br /> Construction Contingency $137,000.00 <br /> Construction Administration/Inspection $82,000.00 <br /> Total Project Cost $1,582,580.00 <br />