Browse
Search
Agenda - 09-06-2012 - 5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 09-06-2012 - Regular Mtg.
>
Agenda - 09-06-2012 - 5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:09:58 PM
Creation date
9/11/2012 10:19:38 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
2012-133 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 09-06-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 6, 2012 <br /> Action Agenda <br /> Item No. 5-i <br /> SUBJECT: Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane <br /> EDD Water and Sewer Extension Project— Phase 2 <br /> DEPARTMENT: Planning PUBLIC HEARING: (Y/N) N <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Original Hobbs, Upchurch & Associates Craig Benedict, Planning Director, 245- <br /> Contract 2592 <br /> 2. Contract Amendment Kevin Lindley, PE, Staff Engineer, 245- <br /> a. Buckhorn-Mebane 2583 <br /> b. Efland Redirection <br /> 3. Maps of Project Area <br /> a. Water <br /> b. Sewer <br /> PURPOSE: To approve two amendments to the Hobbs, Upchurch & Associates (HUA) <br /> contract for design of water and sewer utilities in the extended Efland-Buckhorn-Mebane <br /> Economic Development District (EDD) area. <br /> BACKGROUND: The amendments will add: <br /> 1. Easement negotiation and coordination of the bid ($30,500 and $16,000) for the original <br /> Buckhorn-Mebane EDD Phase 2 <br /> 2. Design and bid services for the Buckhorn-Mebane EDD Phase 2 - Extension (Efland sewer <br /> redirection to Mebane) ($151,600). <br /> Orange County contracted with HUA in November 2010 to provide design and permitting for <br /> water and sewer infrastructure in the Buckhorn EDD area (Attachment 1). To maximize design <br /> efficiency (e.g. choosing a gravity sewer option along Bowman Road, see below), the timeline <br /> as originally set forward would need to be adjusted. The amendment adding time to the <br /> contract as shown in Attachment 2 will simply be an official acknowledgement of this. <br /> Included in the first amendment language is an acknowledgement of the option chosen by the <br /> BOCC to pursue a gravity sewer outfall along Bowman Road. This option was outlined in the <br /> original contract, and as such, is not an amendment. However, the information regarding the <br /> decision to pursue the gravity sewer option along Bowman Road and the cost associated with <br /> this option are included in the Amendment document for clarification purposes. <br /> In addition, staff has received a proposal from HUA to coordinate acquisition of the necessary <br /> easements in the project area. This scope of work is outlined in the amendment, but will <br /> generally include surveying and mapping the easements, contacting and negotiating with <br />
The URL can be used to link to this page
Your browser does not support the video tag.