Orange County NC Website
Change Order No. 3 Summary <br /> Orange County, North Carolina <br /> Buckhorn Area North of 1-85 and Efland Sewer System <br /> Improvements Project <br /> Item Description Cost Impact Time <br /> No. 1 7 1 IM pact <br /> 1 Costs associated with the replacement of the specified <br /> manhole ring and covers with solid covers per the request <br /> of Mebane. Eight manole covers were replaced. $8' 0.00 0 <br /> 2 Adjustment and addition of sewer services installed in <br /> rock unit price item. Per the contract, the Contractor can <br /> request the negotiation of a new price for services that <br /> are installed in a condition other than soil. It is $140,000.00 0 <br /> anticiapted that a total of 70OLF of services will be <br /> installed in rock at the negotiated price of$200.00 per LF. <br /> 3 During the installation of the sewer line along Forest <br /> Avenue, the Contractor encounted the unknown, existing <br /> septic tank for the Ruritan club. The costs are associated $9,732.22 0 <br /> with the delay and demolition of the septic tank to <br /> continue the sewer line installation. <br /> 4 Final adjustment of Quantities for the Buckhorn Area <br /> ($57,.861.72) 0 <br /> section. <br /> TOTAL ESTIMATED CHANGE ORDER AMOUNTI ;92,670.50 0 <br />