Browse
Search
2012-351 AMS - JF Wilkerson for Contract material unit price adjustment for Buckhorn section unforeseen conditions contingency $92,670.50
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-351 AMS - JF Wilkerson for Contract material unit price adjustment for Buckhorn section unforeseen conditions contingency $92,670.50
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2012 4:50:09 PM
Creation date
9/10/2012 4:50:06 PM
Metadata
Fields
Template:
BOCC
Date
8/30/2012
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
2012-351 S AMS - JF Wilkerson for Contract material unit price adjustment for Buckhorn section unforeseen conditions contingency $92,670.50
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project <br /> Orange County, North Carolina <br /> Buckhorn Final Adjustment of Quantities <br /> Item Actual Actual <br /> No. <br /> Item QTY Unit Bid Bid Total Installed Installed Quantity Total Variance <br /> Quantity Quantity Tonal Variance <br /> 4"PVC Service Connections(Cross State <br /> 45 Roads) 125 LF $26.50 $3,312.50 120.00 $ 3,180.00 -5.00 $ (132.50) <br /> 6"PVC Service Connections(No Road <br /> 46 Crossings) 110 LF $58.00 $6,380.00 100.00 $ 5,80000 -10.00 $ (580.00) <br /> 16"PVC Service Connections(Cross State <br /> 47 Roads) 140 LF $64.00 $8,960.00 122.00 $ 7,80800 -18.00 $ (1,152.00) <br /> 14"DIP Service Connections(No Road <br /> 48 Crossings) 100 LF $70.00 $7,000.00 77.00 $ 5,39000 -23.00 $ (1,610.00) <br /> 16"DIP Service Connections(No Road <br /> 49 Crossings) 25 LF $76.00 $1,900.00 22.00 $ 1,67200 -3.00 $ (228.00) <br /> 50 3/4"Service Taps 7 EA $363.00 $2,541.00 0.00 $ -7.00 $ (2,541.00) <br /> 51 Installing 3/4"Copper Water Services 7 EA $680.00 $4,760.00 6.00 $ 4,08000 -1.00 $ (680.00) <br /> Installing 3/4"Coppers tubing from <br /> 52 relocated water meter 100 LF $19.50 $1,950.00 0.00 $ - 100.00 $ (1,950.00) <br /> Totals $413,540.70 $ 355,678.98 $ (57,861.72) <br />
The URL can be used to link to this page
Your browser does not support the video tag.