Orange County NC Website
Buckhorn Area North of 1-85 and Efland Sewer System Improvements <br /> Project <br /> Orange County, North Carolina <br /> Summary of Brookhollow Force Main Redesign Pricing <br /> FORCE MAIN BID PRICING <br /> 34 6" DIP Force Main 2460 1 LF $23.17 $56,998.20 <br /> 36 Installing 6" 22.5 Degree Bends on 6" FM 1 EA $400.00 $400.00 <br /> 37 Installing 6"45 Degree Bends on 6" FM 2 EA $400.00 $800.00 <br /> $58,198.20 <br /> FORCE MAIN REDESIGN PRICING <br /> 34A 8" DIP Force Main 2100 1 LF $30.29 $63,609.00 <br /> 36A Installing 8" 22.5 Degree Bends on 8" FM 1 EA $540.00 $540.00 <br /> 37A Installing 8"45 Degree Bends on 8" FM 2 EA $540.00 $1,080.00 <br /> Complete Tie-in to Existing FM 1 EA $17,477.14 $17,477.14 <br /> $82,706.14 <br /> ANTICIPATED COST IMPACT OF FORCE MAIN REDESIGN $24,507.941 <br /> * NOTE: Unit price items may change due to site conditions and actual quantity installed. <br />