Browse
Search
2012-432 Modification of Mebane Water and Sewer Service Agreement for the Buckhorn-Mebane-Efland Area
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-432 Modification of Mebane Water and Sewer Service Agreement for the Buckhorn-Mebane-Efland Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 4:01:10 PM
Creation date
9/10/2012 8:43:07 AM
Metadata
Fields
Template:
BOCC
Date
6/19/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7c
Document Relationships
Agenda - 06-19-2012 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 06-19-2012 - Regular Mtg.
Link Groups
Link
1:
2012-432 Modification of Mebane Water and Sewer Service Agreement for the Buckhorn-Mebane-Efland Area
Last modified:
1/12/2016 4:01:10 PM
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Annexation and Service (i.e. includes a provision for voluntary annexation). <br />Applications for service for property located east of Buckhorn Road within <br />the service area shall be required to be accompanied by a voluntary <br />annexation application to the City for annexation into the corporate limits of <br />the City. The application may be acted upon by the City of Mebane at their <br />discretion. <br />Potential Urban Growth Annexation Areas and Excluded Area <br />The potential urban growth annexation boundary would include A, B, C, <br />D.1 -5 and E -2. Specific areas (as noted on the attached map labeled Central <br />Efland Phase 1 and Phase 2 and area E -1) are not intended for annexation at <br />the time of this amended agreement. These areas would be part of the <br />utility service area and pay `out of town' rates or as decided by separate <br />agreement. <br />8. Planning Standards. Each party to this Agreement shall retain such <br />planning and regulation of development powers and authority within the <br />service areas as shall now exist or are hereafter expanded or modified by <br />North Carolina Statutes and agreements made from time to time by the City <br />and County which agreements are authorized by North Carolina Statutes. <br />Nothing contained herein shall be construed to limit or to expand any such <br />regulatory or planning jurisdiction or to limit the power of the City to annex <br />into its corporate limits properties within the service area. <br />9. Additional Documentation. The parties agree to and hereby authorize the <br />County Manager and County Attorney and City Manager and City Attorney <br />to prepare and to execute all such other and further documentation or <br />agreements as shall be necessary or desirable in effectuating this <br />Agreement. <br />10. Reservation of Capacity <br />a. Sewer. City shall reserve for the Service Area .25 Million Gallons <br />per Day of capacity in its Sewer Treatment Plant. County shall pay <br />City $50,000.00 (hereafter referred to as `Reservation Fee') per year <br />for ten years from the date first above recorded in this Amended <br />Agreement to preserve and reserve this capacity. At such time as <br />County makes the tenth and final payment of $50,000.00 City shall <br />assume responsibility for determining the appropriate capacity in the <br />Service Area. <br />b. Water. City shall provide water service in proportion to the sewer <br />service provided. <br />C. Reservation Fees <br />1. As utility customers connect to the Service Area system <br />Reservation Fees shall be reduced pro rata. <br />2. Reservation Fees and capacity reservation may be amended <br />as needed by written agreement of the Parties. <br />-4_ <br />Final Version — Approved 6/19/12 Orange County Board of Commissioners, 7/9/12 Mebane City Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.