Browse
Search
Agenda - 08-27-2012 - C2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-27-2012 - Quarterly Public Hearing
>
Agenda - 08-27-2012 - C2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:43:52 PM
Creation date
8/21/2012 4:21:18 PM
Metadata
Fields
Template:
BOCC
Date
8/27/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C2
Document Relationships
Minutes 08-27-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3. "Certi icate" shall mean a Certificate of Public Convenience and Necessity for <br /> water utility service at the Subdivision (defined below) issued by the North Carolina Utilities <br /> Commission. <br /> 1.4. "Closing" shall mean each instance upon which the Water Utility System Assets <br /> are transferred from Developer to Utility regardless of being at one time or in phases. <br /> 1.5. "Closing Date"shall mean the date of the initial or subsequent date of applicable <br /> Closing, as the context requires. <br /> 1.6. "Commission" shall mean the North Carolina Utilities Commission. <br /> 1.7. "DEH" shall mean the North Carolina Department of Environmental Health and <br /> Natural Resources. <br /> 1.8. "Declaration" shall mean a declaration of covenants, conditions and restrictions <br /> for the Subdivision (defined below). <br /> 1.9. "Deeded Property" shall mean the well lot(s), perpetual easement(s) and other <br /> real estate property that is a part of the Water Utility System (defined below) which are <br /> owned by Developer and are used in connection with the Water Utility System (defined <br /> below) or Water Utility System not located within publicly dedicated rights of way and the <br /> rights and interests in and to the access and utility easement being granted, transferred and <br /> assigned by the Developer to Utility, including but not limited to well sites, storage tank <br /> sites, treatment facility sites, treatment disposal sites, private easements, other real estate <br /> property which are needed for the construction, operation, maintenance, repair, and <br /> replacement of the Water Utility System. <br /> 1.10. "Developer" shall mean David Weekely Homes, LLC, a North Carolina limited <br /> liability company, its successors and assigns. <br /> 1.11. "GPM"means gallons per minute. <br /> 1.12. "Permit" or "Permits" shall mean the Water Utility System Permit and/or the <br /> Authorization to Construct issued by DEH, as the context requires. <br /> 1.13. "Service Line" shall mean the portion of the individual household water line for <br /> which Utility will not assume maintenance responsibility. The Service Line shall include only <br /> that portion of the individual household water line that extends from the Utility's water <br /> 2 <br /> Dunhill Water Utility System <br /> Dunhill Agreement 061212.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.