Browse
Search
Agenda - 08-27-2012 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-27-2012 - Quarterly Public Hearing
>
Agenda - 08-27-2012 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:22:05 AM
Creation date
8/21/2012 4:16:31 PM
Metadata
Fields
Template:
BOCC
Date
8/27/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes 08-27-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Orange County Class A SUP Application Dunhill Ma�or Subdivision Chapel Hill NC <br /> these plants is conditionally provided as part of the SUP approval and prior to requesting <br /> construction permits for the project. <br /> ✓ For all developments other than single-family residential and duplexes, existing contour lines <br /> (dashed) and proposed contours (solid) at 5-foot intervals with 10-foot contours bold. Where site <br /> conditions warrant, 2-foot contours may be required; (Existing 2-foot contours are shown on the <br /> Site Plan). <br /> • Retaining walls, tree wells, or rip rap as part of the grading plan; (none proposed) <br /> ✓ Streams, ponds, drainage ditches, swamps, floodway and floodplain boundaries; (Wetland <br /> locations have been identified on the Site Analysis and Site Plans) <br /> ✓ Phase lines and numbers if the development is to be phased; (No phasing is proposed for this <br /> project) <br /> ✓ Methods of disposal of trees, limbs, stumps and construction debris associated with the permitted <br /> activity. Open burning of trees, limbs, stumps, and/or construction debris associated with the <br /> permitted activity is expressly prohibited; (Disposal notes have been included on the Site Plan) <br /> ✓ Compliance with County adopted access management, transportation and/or connectivity plans <br /> and denote the location of future roadway(s) and access easements, whether public or private, <br /> to ensure and encourage future connectivity; and <br /> Based on the layout and nature of the existing developments and roads surrounding this <br /> parcel, the only potential stub out location for connection to a current or future roadway <br /> would be at the western edge of the property where it meets George Circle in the <br /> Freeland Hills Subdivision. However, any potential road connection would involve a <br /> jurisdictional stream crossing and disturbance to the required 65' riparian buffer that <br /> separates these two properties. <br /> ✓ Additional information may be required based on the site location and the type of development <br /> proposed. <br /> SUI► �IIT <br /> DESIGN AND ENGINEERING SERVICES PAGE 13 OF 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.