Orange County NC Website
I Orange County Class A SUP Application Dunhill Ma�or Subdivision Chapel Hill NC <br /> Traffic Study <br /> Per the Orange County UDO, Section 2.5.3(H) a traffic study is not required because the proposed <br /> development is less than 40 lots, and the 26 lots proposed will only generate an estimated 249 vehicle <br /> trips per day (per the Institute of Transportation Engineers ITE Trip Generation manual, 8th Edition). <br /> 2.5.3 Plan Specifications <br /> Each site plan shall be drawn at a scale adequate to show required detail and shall contain the <br /> following information (checked line items are included with the applicationJ: <br /> ✓ The boundary of the lot(s) to be developed labeled with bearings and distances; <br /> ✓ The name, address, and phone number of the applicant and the property owner; <br /> ✓ Name of project, vicinity map, north arrow, scale, tax map reference number, date of plan <br /> preparation, and subsequent revision dates; <br /> ✓ Zoning of the property to be developed and all adjacent zoning and existing adjacent land uses; <br /> ✓ Adjacent right-of-way widths with road names and numbers; <br /> ✓ A development summary including total acres, proposed use(s), total building square footage, <br /> required and proposed parking spaces. <br /> ✓ Demonstrated compliance with all applicable performance standards contained in Articles 3, 4, 5, <br /> and 6 of this Ordinance; <br /> ✓ Maximum and proposed impervious surface and required stream buffers as detailed in Sections 4.2 <br /> and 6.12 of this Ordinance (maximum impervious surface limits are not applicable to this <br /> watershed); <br /> ✓ Estimated traffic generated by the proposed development in trips per day. If the estimate exceeds <br /> 800 trips per day, a traffic impact study must be submitted in accordance with Section 6.17; (not <br /> applicable) <br /> ✓ Front, side, and rear building setbacks as required by Articles 3 and 5 of this Ordinance; <br /> ✓ Location of all proposed buildings and structures labeled with floor area, building height and <br /> function, and proposed finished floor elevation; (Illustrations of the proposed home plans are <br /> provided in the appendix). <br /> ✓ Vehicular use areas including existing and proposed streets and access drives, off street parking <br /> and loading to comply with Section 6.9 of this Ordinance, and entry/exit points of adjacent <br /> parcels; <br /> ✓ Overhead and underground utilities with accompanying easements and storm drainage <br /> facilities/easements (including septic tanks and wastewater disposal fields, wells, fire hydrants, <br /> irrigation, and security lights); (The proposed public and private utility easements and areas <br /> reserved for stormwater management are shown on the plan.) <br /> • Solid waste disposal facilities; (not applicable) <br /> ✓ All proposed free-standing and wall-mounted signs. Signs must comply with Section 6.12 of this <br /> Ordinance; (The applicant requests that detailed sign illustrations and designs are provided <br /> conditionally upon approval of the SUP and prior to sign and building permit applications) <br /> ✓ A landscape plan demonstrating compliance with Section 6.8 of this Ordinance; The applicant <br /> requests that a the detailed landscape plan, including the listing of the specific types and sizes for <br /> SUI► �IIT <br /> DESIGN AND ENGINEERING SERVICES PAGE 12 OF 14 <br />