Orange County NC Website
I Orange County Class A SUP Application Dunhill Ma�or Subdivision Chapel Hill NC <br /> Article 2: Procedures Section, 2.5 Site Plan Review Sections, 2.5.2: Application Requirements <br /> (AJ Each site plan shall be prepared and sealed by an appropriately licensed professional. <br /> The Plans submitted with this application have been prepared by Michelle Kempinski, <br /> Registered Landscape Architect. <br /> (BJ The applicant shall submit to the Planning and Inspections Department: <br /> (1J Three copies of the site plan prepared in accordance with the provisions detailed in this Section. <br /> Additional copies may be required depending on the nature and location of the proposed <br /> developmentJ; <br /> Copies of the application and plans have been submitted per the Class A SUP requirements. <br /> (2J The completed site plan application form; <br /> The Class A SUP application form has been submitted and a copy is included in the appendix. <br /> (3J A copy of the Orange County tax map with the subject property identified; <br /> The Submitted site plan includes a completed Boundary Survey for the property along with the <br /> OC land records tax identification information for the property. <br /> (4J Legal documentation, to be approved by the County Attorney, establishing entities responsible for <br /> control over common areas and facilities. <br /> Please refer to the attached Sample Homeowner's Declaration of Covenants, Conditions and <br /> Restrictions, which will be revised as needed during the project's review and approval process to <br /> address the reviewer's conditions for the Dunhill Subdivision. <br /> (5J Three copies of the Environmental Assessment and/or Environmental Impact Statement, if required <br /> under Section 6.16 of this Ordinance. <br /> In addition to the Site Analysis sheet provided, copies of the Wetlands and Soil Surveys <br /> provided by Soils Sciences, PLLC and the Orange County Wetland Determination report are <br /> also included with this application. Per Section 6.16: Environmental Impact Reports, an <br /> Environmental Impact Statement is not required for this project. <br /> (6J A statement regarding the method of disposal of trees, limbs, stumps and construction debris <br /> associated with the permitted activity. Open burning of trees, limbs, stumps, and/or construction <br /> debris associated with the permitted activity is expressly prohibited. <br /> A disposal statement is provided on the Site Plan <br /> (CJ Other items which should be submitted simultaneously but are not required as part of the site plan <br /> application are: <br /> (1J Erosion control and grading plans as necessary to be approved by the Erosion Control Officer for a <br /> grading permit, and <br /> An initial engineering assessment of the land area that may be required to treat Stormwater <br /> runoff is illustrated on the Site Plan. The applicant requests that the detail design of the <br /> Stormwater management system is provided conditionally upon approval of the Class A SUP <br /> and prior to issuing construction permits for the project. <br /> (2J Building construction plans to be approved by the Building Official prior to issuance of a building <br /> permit. <br /> The applicant requests that building construction plans will be developed and building permits <br /> will be sought conditionally upon approval of the Class A SUP. <br /> SUI► �IIT <br /> DESIGN AND ENGINEERING SERVICES PAGE 11 OF 14 <br />