Orange County NC Website
I Orange County Class A SUP Application Dunhill Ma�or Subdivision Chapel Hill NC <br /> 5.15.6 Major Subdivision (A) Standards for Class A Special Use Permit Submiltal Requirements <br /> In accordance with Article 5: Special Uses, Section 5.15.6: Major Subdivisions, the following additional <br /> information is provided with the application: <br /> Notification <br /> A list of all properties within 500 feet of the subject property has been compiled and presented to <br /> Orange County Planning. A copy of this property listing is provided in the appendix. <br /> Development Schedule <br /> The anticipated schedule for project development will initiate road and utility design immediately <br /> following the Preliminary Site Plan and SUP approval. This will be followed by the project's <br /> infrastructure permitting and construction, according to the schedule below: <br /> • August-December 2012: SUP submittal and review process, public hearings and Board meetings. <br /> • December 2012: Anticipated BOCC Approval of SUP <br /> • January 2013 - June 2013: Final engineering design and construction drawings <br /> • June 2013: Zoning Compliance and Permit Applications <br /> • July 2013-June 2014: Subdivision Construction <br /> Water and Wastewater <br /> If the proposed lots are to be served by individual wells or community wells, a professionally prepared <br /> groundwater yield analysis relating the proposed wells to the U.S. Geological Survey Water Resources <br /> Investigations Report 00-4286 and any later USGS Water Resource Investigation Report data available. <br /> The applicant proposes installation of a community well for the 26-lot subdivision. The well is <br /> planned to be installed and operated by Aqua North Carolina, Inc. A draft utility services <br /> agreement between the developer and Aqua North Carolina, Inc. is included in the appendix <br /> of this application. <br /> In response to requirement above, Peggy-Sue Dodge, Senior New Business Coordinator with <br /> Aqua NC has provided the following information in an email to the developer, dated <br /> 6/14/2012: <br /> "The County's generally will require a copy of the DEH permit in order to obtain platting of lots. This permit approval <br /> states the production available to ser the project. This cannot be obtained until the Developer has obtained (a)well <br /> site approval, (b)well drilling construction lot, (c) 24-hour well drawdown testing results, (d) analytical results, (e) <br /> engineering design and submittal to DEH." <br /> "Developer will have to: <br /> I. Obtain DEH approval of the well site and before drilling begins wait for the pre-drill site approval (week); <br /> 2. Begin the drilling process (3-4 days); <br /> 3. Begin the 24-hour well drawdown test (day); <br /> 4. Analytical testing (4-b weeks); <br /> 5. Engineering design and review(2-3 weeks); <br /> b. Once submitted it will take DEH approximately 4 weeks to complete the review process and issue permit so <br /> construction can begin; <br /> 7. Certificate issued to Aqua by the Utilities Commission approve the new service territory(3-4 weeks)." <br /> The developer requests that compliance with 5.15.6(A)(1)(C)(iv) be added as a condition of the <br /> Class A SUP approval. <br /> SUI► �IIT <br /> DESIGN AND ENGINEERING SERVICES PAGE 8 OF 14 <br />