Browse
Search
Agenda - 08-27-2012 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-27-2012 - Quarterly Public Hearing
>
Agenda - 08-27-2012 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:22:05 AM
Creation date
8/21/2012 4:16:31 PM
Metadata
Fields
Template:
BOCC
Date
8/27/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes 08-27-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38.5.5 After backfilling the supply line and prior to system approval, the pump <br /> delivery rate shall be measured and verification made of the flow at the <br /> distal end of the supply line or distribution device. <br /> 38.5.6 Drainfield alternating device(s) and other distribution devices shall be <br /> demonstrated to be functional and accessible from the finished ground <br /> surface. <br /> 38.6 Operation, Maintenance and Monitoring Requirements <br /> 38.6.1 System management shall be required in accordance with Rule .1961(b), <br /> Table V(b). However the following minimum inspection/maintenance and <br /> reporting requirements shall apply unless otherwise specified in the <br /> Operation Permit. <br /> 38.6.2 The following items shall be monitored: <br /> • visual observation of the drainfield, <br /> • checking/cleaning filter screen(s), <br /> • checking sludge levels of tankage, <br /> • measuring delivery rate, <br /> • visual observation of the supply line and appurtenant valves for <br /> leakage and damage, <br /> • alternation of drainfield alternating devices, <br /> • measuring of pressure head and flushing of distribution devices as <br /> applicable, <br /> • assurance that the ground surface and vegetation over the <br /> drainfield and supply lines are maintained. <br /> 38.6.3 The owner shall be responsible for assurance of all maintenance and repair <br /> of the system including the mowing of grass over the drainfield and <br /> maintenance of access of the supply line easement areas. The repair and <br /> maintenance responsibilities shall be clearly defined and specified in the tri- <br /> party agreement and easement as applicable <br /> 38.7 Repair of System: The provisions of 15A NCAC 18A .1961 shall govern the <br /> use of the remote septic system for repairs to existing malfunctioning wastewater <br /> systems. <br /> 38.8 Related Policy, Procedure, Guidelines and Forms: <br /> 38.8.1 Sample Tri-party Agreement <br /> 38.8.2 Sample Easement Documents <br /> 38.8.3 Sample Declaration Documents <br /> 38.8.4 CA Issuance Procedure <br /> 38.8.5 OP Issuance Procedure <br /> Page 7 of 7 <br /> Review Due Date: April 17,2009 <br /> Reviewed by:Environmental Health Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.