Browse
Search
Agenda - 08-27-2012 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-27-2012 - Quarterly Public Hearing
>
Agenda - 08-27-2012 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:22:05 AM
Creation date
8/21/2012 4:16:31 PM
Metadata
Fields
Template:
BOCC
Date
8/27/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes 08-27-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Orange County Class A SUP Application Dunhill Ma�or Subdivision Chapel Hill NC <br /> CLASS A SPECIAL USE PERMIT APPLICATION REQUIREMENTS <br /> The applicant, Weelkey Homes, LLC is seeking approval for a Class A Special Use Permit (SUP) to <br /> develop the 26-lot Dunhill Residential Subdivision. The applicable review and approval process for a <br /> Class A SUP is outlined in Article 2, Section 2J: Special Use Permits of the Orange County 2011 UDO. <br /> Section 2.7.9: Standards of Evaluation, outlines the following specific standards that shall be used in <br /> assessing an application: <br /> (A) The project meets all applicable design standards and other requirements of this Ordinance. <br /> It is the applicant's intention to demonstrate compliance with the SUP review process and <br /> conformance with the applicable UDO design standards. In fulfillment of this obligation, the <br /> applicant submits for review this project narrative, a Site Analysis, and a Site Plan with the Class <br /> A SUP application. <br /> (B) The development can reasonably be completed within the vesting period requested, if any. <br /> Please refer to the project's development schedule, provided in the section addressing 5.15.6 <br /> Major Subdivision (A) Standards for Class A Special Use Permit Submittal Requirements. <br /> (CJ Where vesting in excess of two years is requested, the project is located in an area where current <br /> issues under study do not involve potential amendments to the Comprehensive Plan and/or this <br /> Ordinance. <br /> Please refer to the project's development schedule, provided in the section addressing 5.15.6 <br /> Major Subdivision (A) Standards for Class A Special Use Permit Submittal Requirements. <br /> Conformance to Orange County Development Standards <br /> Review of this project is also subject to the General and Specific Review Standards outlined in Section <br /> 5.3.2, of the Orange County 2011 UDO. The design of the project is subject to the General Provisions <br /> and Design Standards described in Article 7: Subdivisions, the dimensional standards of Section 3.3: <br /> Residential Districts (RB) of the Orange County UDO, and the applicable residential Development <br /> standards provided in Article 6 of the UDO. <br /> The proposed Site Plan for the Dunhill subdivision has been designed to comply with the General and <br /> Specific provisions for a Conventional Major Subdivision development in Orange County outlined in <br /> Article 7: Subdivisions and Article 6: Development Standards. <br /> The 1986 Orange County, Chapel Hill and Carrboro Joint Planning Agreement JPA <br /> For residential subdivision projects located within the Joint Planning Area (JPA) of the Orange County <br /> Rural Buffer, the provisions of the Joint Planning Agreement overlay the standards of the OC 201 1 UDO. <br /> Per Section 3.3 of the UDO, the allowable residential density in the RB zoning district is 2 acres/lot. The <br /> maximum calculated lot yield for the existing 68.5-acre parcel (less road ROWs) is 32 lots. For <br /> subdivisions within the Rural Buffer, the JPA specifically requires a minimum 2-acre lot size. <br /> The JPA's 2-acre minimum lot size requirement supercedes the minimum 2-acre/lot density <br /> requirement described within the OC UDO and inhibits application of the UDO's design standards for <br /> Flexible/Cluster subdivisions. <br /> SUI► �IIT <br /> DESIGN AND ENGINEERING SERVICES PAGE 4 OF 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.