Browse
Search
Agenda - 08-21-2012 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-21-2012 - Regular Mtg.
>
Agenda - 08-21-2012 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:03:16 AM
Creation date
8/17/2012 4:59:44 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes 08-21-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
015 <br /> Sheet#5: Comparison of Options <br /> Concept Plan Variable Concept Plan A Concept Plan B <br /> • Improved road alignment • Improved entrance intersection and <br /> Distinguishing Characteristics • Maintain existing internal circulation <br /> stormwater ponds • Largest area of development <br /> • Improved traffic circulation for vehicles and pedestrians <br /> • Proposed road along east side of site(dedicated right of way) <br /> • • • : . • Additions to existing buildings with associated parking <br /> • Maintain undisturbed southwest area <br /> • An additional 350,000 sf of floor area available per Town's ordinance <br /> - - • • - 220,000 sf 390,000 sf <br /> Undisturbed - 7 acres 10 acres <br /> Ponds R- • - • no yes <br /> Infrastructure Cost moderate high <br /> Impact Hardwoods in Southwest . no no <br /> Good potential for meeting future Highest potential for eliminating need for <br /> Future • Acquisition space needs on this site,without <br /> additional land acquisition future land acquisition <br /> Operational Costs Multiple buildings on multiple Co-located, centralized buildings <br /> sites increases operational costs potentially lowers operational costs <br /> • • <br /> )F ACEUMMUDW • <br /> high highest <br /> Needs <br />
The URL can be used to link to this page
Your browser does not support the video tag.