Orange County NC Website
015 <br /> Sheet#5: Comparison of Options <br /> Concept Plan Variable Concept Plan A Concept Plan B <br /> • Improved road alignment • Improved entrance intersection and <br /> Distinguishing Characteristics • Maintain existing internal circulation <br /> stormwater ponds • Largest area of development <br /> • Improved traffic circulation for vehicles and pedestrians <br /> • Proposed road along east side of site(dedicated right of way) <br /> • • • : . • Additions to existing buildings with associated parking <br /> • Maintain undisturbed southwest area <br /> • An additional 350,000 sf of floor area available per Town's ordinance <br /> - - • • - 220,000 sf 390,000 sf <br /> Undisturbed - 7 acres 10 acres <br /> Ponds R- • - • no yes <br /> Infrastructure Cost moderate high <br /> Impact Hardwoods in Southwest . no no <br /> Good potential for meeting future Highest potential for eliminating need for <br /> Future • Acquisition space needs on this site,without <br /> additional land acquisition future land acquisition <br /> Operational Costs Multiple buildings on multiple Co-located, centralized buildings <br /> sites increases operational costs potentially lowers operational costs <br /> • • <br /> )F ACEUMMUDW • <br /> high highest <br /> Needs <br />