Browse
Search
Agenda - 08-21-2012 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-21-2012 - Regular Mtg.
>
Agenda - 08-21-2012 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 10:32:28 AM
Creation date
8/17/2012 4:41:00 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes 08-21-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-030 Ordinance Amending the Unified Development Ordinance - Dimensional and Ratio Standards (UDO/Zoning 2012-11)
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 3: Base Zoning Districts 023 <br /> Section 3.5: Industrial Districts <br /> 40,000 square feet and 1.99 acres in size; zoning lots two acres and greater in size shall have a minimum <br /> usable lot area of at least 40,000 square feet. <br /> 6. Access shall consist of direct vehicular access to streets designated either arterial or collector by the <br /> adopted Comprehensive Plan.Access to rail service is desirable but not required. <br /> 7. Proposed subdivisions are subject to all applicable subdivision standards detailed in Article 7. Note that <br /> Article 7 provides for different dimensional requirements than those shown in the Dimensional and Ratio <br /> Standards table depending upon the type of subdivision proposed and the percentage of open space <br /> provided. <br /> 8. Subdivisions proposing private roads are subject to larger setbacks and minimum lot sizes than those listed <br /> in the Dimensional and Ratio Standards. Refer to Section 7.8.4 for additional requirements. Refer to <br /> Section 7.8.5 for private road standards. <br /> 9. Subdivisions in the Economic Development, Commercial and/or Industrial Nodes are subject to the <br /> procedure outlined in Section 2.16. <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.