Browse
Search
Agenda - 08-21-2012 - 5m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-21-2012 - Regular Mtg.
>
Agenda - 08-21-2012 - 5m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:41:09 AM
Creation date
8/17/2012 4:27:09 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5m
Document Relationships
2012-317 Solid Waste - W L Bishop Construction Inc for Walnut Grove church Rd Solid Waste Convenience center $887,092
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 08-21-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ooa <br /> ��/-�C/�f���J-r 3 � <br /> [Departmental Use Onty] ' <br /> TITLE Walnut Grove Conv.Ctr <br /> FY FY11-12 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$1,000,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called"Agreement"),made as of the 21st da.y of ' <br /> August, 2012, by and between W.L. Bishop Construction, Inc., (hereinafter called the "Contractor'�, and <br /> Orange County,a body politic and a political subdivision of the State of North Carolina,(hereinafter called the <br /> "Owne�"). . <br /> WITNESSETH: ' <br /> That the Contractor and the Owner,for the consideration herein named,agree as follows: � , <br /> � <br /> � <br /> 1. CONTRACT DOCUMENTS;PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings and Written Specifications. The Contract Documents form the Contract and are fully <br /> incorporated herein. In the event of any inconsistency between or among the Contract Documents the , <br /> Contract Documents shall be interpreted in the following order of priority: , <br /> a. This Agreement. ', <br /> ; <br /> b. Designer Approved Bulletins andlor Field Orders. ' <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials,and perform all of the work required by ' <br /> this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the ' <br /> Contractor and Owner and in accordance with the following enumerated documents, which are made a part <br /> hereof as if fully contained.herein: <br /> a. Construction Drawings prepared by HDR Engineering Inc. of the Carolinas, Inc. (Sheet sets <br /> GO1-3;C00-18; SO1-4;POl-2;E01-6;related addendum 1,2 and 3 dated June2012) <br /> b. Written specifications prepared by the project engineer. <br /> c. W.L. Bishop Construction,Inc. proposal dated July 26, 2012 which fully describes the work <br /> to be performed,such work(hereinafter called the"Work"). <br /> d. Related documents listed under Section 1 above. � <br /> 3. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work pursuant to the written Notice-to Proceed. <br /> Revised November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.