Browse
Search
Agenda - 08-21-2012 - 5m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 08-21-2012 - Regular Mtg.
>
Agenda - 08-21-2012 - 5m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:41:09 AM
Creation date
8/17/2012 4:27:09 PM
Metadata
Fields
Template:
BOCC
Date
8/21/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5m
Document Relationships
2012-317 Solid Waste - W L Bishop Construction Inc for Walnut Grove church Rd Solid Waste Convenience center $887,092
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 08-21-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
004 <br /> ATTACHMENT 1 <br /> August 6,2012 <br /> Mr.Gayle Wilson <br /> Orange County Solid Waste Director <br /> 1207 Eubanks Road <br /> PO Box 7177 <br /> Chapel Hill,NC 27516-2113 <br /> Re; Orange County Convenience Center <br /> Walnut Grove Church Road Convenience Center Expansion <br /> HDR Project No.350207-142839-018 <br /> Dear Mr. Wilson: <br /> HDR Engineering, Inc. of the Carolinas(HDR)has reviewed the bids for the Walnut Grove Church <br /> Road Convenience Center Expansion Construction project. The project consists of an expansion to <br /> the existing convenience center. Construction activities include exca.vation/structural fill of soil, <br /> retaining walls & other structural components, paving& gravel access roads, erosion and sediment <br /> control measures,etc. <br /> The following information is provided rogarding our evaluation of bids received. <br /> Background <br /> Seven bids were received by 4:00 p.m. on July 26, 2012. Bids were received from the following <br /> contractors and are listed in ascending order of the total lump sum bid price for the Walnut Grove <br /> Church Road Convenience Center Expansion: <br /> 1. W.L. Bishop Construction Company <br /> 2. Bar Construction Company,Inc. <br /> 3. SEPI Engineering&Construction,Inc. <br /> 4. DeVere Construction Company,Inc. <br /> 5. Triangle Grading&Paving Z. <br /> 6. Mackem Construction,LLC <br /> 7. Environmantal Specialties International,Inc. <br /> Tabulallon <br /> The above-referenced bids were examined for accuracy and compliance with the bid requirements. <br /> A certified tabulation is enclosed and includes all numerical information provided with the bid. <br /> Irregularities have been noted on the tabulation. <br /> N0�Eqi��Klno,I�o,dl��C�nlln�s 12B 5 Tryan Street Phone:l]OA133&810� <br /> Suin 140o Far:17a►133&B7A0 <br /> Cherlotte.NC 2A202-5001 www.hdrine.c�n <br /> pv:11PWAPPIPAO/:SoWhFml_7b�palDoamienfal0rwnr_CoMiry_MCIOrar�r('.o_70/0 SofldWmM_SrralOw�ge�Ca_t;ni,'sanWa�d���rm���r�ob"u,rv°eudlu.EY��°e�a�eoaaxa�����ne'.�.tra��",�vau�°�r� <br /> �1pmWonlBky/na1/xnr JO/JIJO1tOd0/71NYG1/Ilwn Wt',CCBRtcanroei�Nm�abc <br />
The URL can be used to link to this page
Your browser does not support the video tag.