Orange County NC Website
002 <br /> General Construction Project Component: <br /> The project's engineering consultant, HDR Engineering, Inc., worked with staff to complete <br /> construction documents through the spring of 2012. The construction component of the project <br /> was bid in April, 2012. On June 5, 2012, the bids were rejected by the BOCC due to the <br /> withdrawal of bids from the first and second low bidder. The BOCC authorized staff to rebid the <br /> project and to present the recommended award to the BOCC after the summer break. <br /> On June 24, 2012 Orange County advertised Bid Number 387-284 for the general construction <br /> component of the project. A pre-bid conference for the bid was held on July 2, 2012 with <br /> County staff and the designer. Seven contractors attended the meeting. Sealed bids were <br /> received by Orange County on July 26, 2012 with seven (7) companies submitting bids for the <br /> project. Attachment 1 is the certified bid tabulation of the results. <br /> After a period of review of the bid documents by the County's engineering consultant, W.L. <br /> Bishop Construction of Hillsborough, NC was determined to be the lowest responsive, <br /> responsible bidder for the construction project. <br /> Equipment Component of Project: <br /> On July 13, 2012 Orange County advertised Bid Number 285 for the stationary compactors and <br /> 40 cubic yard octagon compaction containers for the project. Sealed bids were received by <br /> Orange County on July 26, 2012 with seven (7) companies submitting bids for the project. <br /> Attachment 2 is the bid tabulation of the results. After thorough staff review, Baker Waste of <br /> Valdese, NC was determined to be the lowest responsive, responsible bidder for the equipment <br /> for the project. <br /> Temporary Services During Construction/Public Communication: <br /> When construction begins at the Walnut Grove Church Road convenience center site, current <br /> operations at the site will be modified. At that time the collection of household garbage and the <br /> disposal of used motor oil and filters, antifreeze, and batteries will become the only operation <br /> that will occur at this site for the duration of the construction project. These activities will take <br /> place on the leased portion of the property only. The leased site is too small to provide for <br /> continuing all current activities. <br /> For recycling purposes, a 24-hour temporary recycling drop-off center will be located at Cedar <br /> Grove Park, 5800 Highway 86 North, Hillsborough, four (4) miles north of the Convenience <br /> Center. This site will only accept mixed paper, magazines and newspaper, plastic bottles, jugs, <br /> glass bottles and jars, aluminum and steel cans in single stream roll-off containers and <br /> corrugated cardboard in dumpster containers. All other materials and services currently <br /> handled at the site will need to be delivered to another convenience center site or held until the <br /> Walnut Grove Church Road construction is complete and the center is open for use. The 24- <br /> hour recycling drop-off site at Hampton Pointe, behind Home Depot in Hillsborough, will also be <br /> available for traditional recycling. <br />