Browse
Search
2012-194 EMS - Eaton Corporation for Check if UPS struck by Lightning is repairable $ Not Listed
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-194 EMS - Eaton Corporation for Check if UPS struck by Lightning is repairable $ Not Listed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2012 4:20:28 PM
Creation date
8/1/2012 4:09:58 PM
Metadata
Fields
Template:
BOCC
Date
7/30/2012
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
2012-194 NVS EMS - Eaton Corporation Check if UPS struck buy Lighting is repairable $ not listed
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT X -1 <br />Time and Material <br />Service Rate Schedule <br />UJISTION <br />Powerino Business Worldwide <br />The following rate schedule applies to all services rendered on non - contracted and non - warranty equipment <br />and to all services performed on contracted equipment where the service performed is outside the scope of the <br />contracted coverage. Labor rates are based on the actual time of delivery. Specific contract customers may be <br />eligible for discounts on time and material charges. <br />3 -Phase Products - Portal to Portal Labor per Hour (On -site and Travel Time) <br />Mon. — Fri., Business Hours (8AM — 5PM): $247.00 <br />Mon. — Fri., After Business Hours (5PM — 8AM): $318.00 <br />Weekends and Holidays (Saturday 12:01AM — Sunday Midnight): $394.00 <br />3 -Phase Products - Minimum Labor Billing (minimum value range equal to above rates x hourly min.) <br />Equipment below 200kVA, Five day or less response (4 hour min.): $987 to $1,575 <br />Equipment 200kVA and above or Multi Module, Five day or less response (6 hour min.): $1,481 to $2,363 <br />Equipment 200kVA and above or Multi Module, Two day or less response (8 hour min.): $1,974 to $3,150 <br />1 -Phase Products - Portal to Portal Labor per Hour (On -site and Travel Time) <br />Mon. — Fri., Business Hours (8AM — 5PM): $196.00 <br />Mon. — Fri., After Business Hours (5PM — 8AM), Weekends and Holidays: $317.00 <br />1 -Phase Products - Minimum Labor Billing (minimum value range equal to above rates x hourly min.) <br />Equipment below 200kVA, Five day or less response (4 hour min.): $783 to $1,267 <br />Equipment 200kVA and above or Multi Module, Five day or less response (6 hour min.): $1,175 to $1,901 <br />Equipment 200kVA and above or Multi Module, Two day or less response (8 hour min.): $1,566 to $2,534 <br />Travel & Living Expenses <br />Transportation: <br />3 -Phase Products: <br />1 -Phase Products: <br />All others (air fare, car rental, tolls, etc.): <br />Lodging & Meals: <br />Calculation of Labor and Mileage Charges: <br />Materials /Spare Parts: <br />Minimum billing: <br />Parts Expedite Fees <br />Mon. — Fri., Business Hours (8AM — 5PM): <br />Mon. — Fri., After Business Hours (5PM — 8AM): <br />Weekends and Holidays: <br />Freight Expense <br />Freight- FOB Factory: <br />Same Day Delivery: <br />Automobile mileage included in labor rates <br />Automobile mileage at $ 0.70 per mile <br />Actual <br />Actual <br />Portal to Portal (travel labor and mileage) <br />Current List Price <br />$110 Domestic, $275 International <br />$110 <br />$275 <br />$440 <br />Actual <br />$155 plus Actual Freight <br />Depot Repair Labor: $132 per hour <br />Minimum Billing: $132.00 <br />Expediting Fee: $110.00 <br />Note: 3 -Phase products include Eaton BladeUPS, Best Power Unity UT3 310 -360 models; 1 -Phase products <br />include Eaton 9155, Powerware 9150, Best Power Unity UT3K, UT8K) <br />Eaton Corporation Attachment X•1 Time and Materials Rata Schedule Revision: January 1, 2012, Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.