Browse
Search
Minutes - 20050614
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2005
>
Minutes - 20050614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 2:39:01 PM
Creation date
8/13/2008 2:33:14 PM
Metadata
Fields
Template:
BOCC
Date
6/14/2005
Document Type
Minutes
Document Relationships
Agenda - 06-14-2005-
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 06-14-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rod Visser said that this is part of an interlocal agreement with the Town of <br />Hillsborough, so it was treated as an operating expense. Commissioner Jacobs said that it <br />might be easier to track in the CIP. <br />Commissioner Jacobs asked about the school collaboration consultant and asked if this <br />was costing $12,000 a year. Rod Visser said that for the last year, the County has been paying <br />bills for this. They will raise this issue at the next collaboration meeting. <br />Commissioner Halkiotis asked about rewarding County employees that come up with <br />ideas that save the County money. He asked if anyone had come up with any ideas lately, and <br />if they have been rewarded. John Link said that they have rewarded employees andlor teams <br />of employees with good practices. They have not rewarded anyone with cash. <br />Commissioner Halkiotis said that a reward system is very important and it works in the <br />private sector. He thinks this would stimulate people into thinking of ways to save money. John <br />Link said that they talked about this at the last efficiency process. The question is the amount. <br />Section 4: <br />Commissioner Jacobs referred to page 4-13, Tax Assessor, and asked how the County <br />costs went up $135,000. Donna Dean said that several long-term employees have retired this <br />year, which is reflected in the 12-month estimate being lower than the original budget. A <br />position was also moved from the Tax Assessor's Office to the Tax Collector's Office. <br />Commissioner Halkiotis made reference to the increase in the Information Technology <br />budget for next year. He asked what this would include and the replacement cycle. <br />Rad Visser said that before Information Technology Director Todd Jones came to the <br />County, there was athree-year desktop replacement cycle. This was then slowed down to a <br />four-year replacement cycle. At this time, it is about five or six years. <br />Todd Janes said that they have skipped two years of the four-year cycle, so half of the <br />fleet is five or six years old. Regarding areas of increase, the two largest items are the <br />telephone charges and the equipment repair. They are trying to move the ongoing charges into <br />the operating budget and out of capital. Regarding equipment repair, there has been an <br />increase in annual maintenance charges far software. The bulk of it is the MUNIS system, <br />which is $66,000 annually. There are also increases in charges for new packages in the <br />Sheriff's system and land records. As new technologies are acquired, there is a resulting <br />increase in annual maintenance fees. <br />Commissioner Halkiotis made reference to page 4-5 that there are 750 network PC's <br />and there are 796 County employees. He thinks that the lowest paid employees probably do <br />not have the PC's. Todd Jones said that they are close to having one-to-one equity of <br />computers to employees. <br />Commissioner Halkiotis asked about the total phone charges and Todd Jones said <br />$179,000. Commissioner Halkiotis asked if they were looking at a new phone system for the <br />County. Todd Jones said that he and Pam Jones have held discussions, but they are <br />preliminary. <br />Chair Carey asked why Building and Grounds was going from $2.7 million to $3.1 million <br />and why the recommended amount was less. Public Works Director Wilbert McAdoo said that <br />the additional cuts are reflected in utilities and part of it was that the Manager took some of the <br />money out for reserve for utilities. <br />Rod Visser said that the total request came in at a $500,000 increase over last year. <br />They cut another $100,000 off. <br />
The URL can be used to link to this page
Your browser does not support the video tag.