Browse
Search
Agenda - 06-14-2012 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 06-14-2012 - Budget Work Session
>
Agenda - 06-14-2012 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 3:27:17 PM
Creation date
6/8/2012 4:39:35 PM
Metadata
Fields
Template:
BOCC
Date
6/14/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 06-14-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
011 <br /> Attachment C <br /> b. Screening Process <br /> The following screening process is a prioritized hierarchy of specific factors that should be <br /> weighed to determine "the best" or "most suitable" site for a library. The three tiers of <br /> screening criteria form a naturally weighted system that can guide the selection of a library <br /> site. A suggested site can be evaluated by staff in a range of 20 to 30 days at no cost outside <br /> of invested Orange County staff time. <br /> Low Med High Phase I <br /> 1 2 3 Visibility <br /> • Visible from the street <br /> • Traffic count that meets or exceed the average traffic <br /> counts of a major thoroughfare in a community <br /> • Visual appeal <br /> 1 2 3 Site Capacity <br /> • Meets minimum acreage (urban services vs. rural <br /> services) <br /> • Space for building and on-site parking <br /> • Adequate utilities <br /> • Space for future expansion <br /> • Space to accommodate the necessary setbacks, road <br /> expansions and other site amenities. <br /> 1 2 3 Access <br /> • Accessibility for pedestrians <br /> • Accessibility for vehicles <br /> • Accessibility for public transportation <br /> 1 2 3 Alignment with Planning Tools (Comprehensive <br /> Plan) <br /> 1 2 3 Lease versus Purchase <br /> • Analysis of the long term viability of the site <br /> • Availability of property for lease <br /> 1 2 3 Centrality of Location <br /> • Existing population <br /> • Growth and development <br /> • Proximity to schools <br /> • Proximity to retail <br /> • Proximity to other libraries <br /> Site is not isolated <br /> Total: Phase I <br /> (If total ranking equals 6 or more, excluding a ranking of <br /> one (1), go to Phase II) <br />
The URL can be used to link to this page
Your browser does not support the video tag.