Browse
Search
Agenda - 06-14-2012 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 06-14-2012 - Budget Work Session
>
Agenda - 06-14-2012 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 3:27:17 PM
Creation date
6/8/2012 4:39:35 PM
Metadata
Fields
Template:
BOCC
Date
6/14/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 06-14-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ono <br /> Attachment C <br /> SITE SELECTION CRITERIA: The Manager has directed staff to provide a set of library site <br /> selection criteria and procedures for County Commissioner review, comment and eventual <br /> adoption. <br /> The following suggested criteria were assembled using nationally established guidelines and <br /> include a set of guiding principles as well as an objective screening process. It is <br /> contemplated staff would utilize this comprehensive information to evaluate sites proffered by <br /> the Commissioners or other designated site selection body. <br /> a. Guiding Principles <br /> When selecting a site for a new or expanded library, the Library system takes into account <br /> three fundamental factors: <br /> • The Library System recognizes that as a regional service provider, the location of <br /> libraries must provide for optimal service to the most number of residents within the <br /> entire System service area. This takes precedence over political boundaries or <br /> undeveloped neighborhoods. <br /> • The Board is committed to providing an equitable level of service throughout the entire <br /> County. <br /> • The placement of a library in a manner that maximizes its use will be more valuable <br /> over the long term than the original investment made in land or building. Typically, the <br /> original cost of a new building is exceeded in just three years by its cumulative <br /> operating costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.