Browse
Search
ORD-2012-020 Proposed UDO Text Amendment: New Section 6.20: Public Sewer Connection
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2012
>
ORD-2012-020 Proposed UDO Text Amendment: New Section 6.20: Public Sewer Connection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 3:45:20 PM
Creation date
6/7/2012 3:23:07 PM
Metadata
Fields
Template:
BOCC
Date
6/5/2012
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6a
Document Relationships
Agenda - 06-05-2012 - 6a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 06-05-2012 - Regular Mtg.
Minutes 06-05-2012
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,;;� - s - / z, <br /> ORD - 2.di_.- vas <br /> Commissioner Jacobs said that he wanted to point out that Orange County maintains a <br /> living wage for its employees and in its contracts for those who are providing in-home aide for <br /> seniors. He said that it is important to continue to reaffirm this fact. <br /> A motion was made by Commissioner Jacobs, seconded by Commissioner Yuhasz to <br /> approve continuing contracts to provide In-Home Aide Services with Arcadia Health Services, <br /> Inc., Premier Home Health Care Services, Inc., Personalized Patient Home Assistance, Inc., <br /> CNC Access, Inc., Flaircare, Inc., and TAMM, L.L.C. for FY 2012-2013, and authorize the Chair <br /> to sign the contracts contingent upon approval of the Orange County FY 2012-2013 budget. <br /> VOTE: UNANIMOUS <br /> 6. Public Hearings <br /> a. Proposed LIDO Text Amendment: New Section 6.20: Public Sewer <br /> Connection <br /> The Board received the Planning Board recommendation, closed the public hearing, and <br /> considered a decision on a Planning Director initiated text amendment to create a new Section <br /> 6.20 of the Unified Development Ordinance (UDO) outlining public sewer connection <br /> requirements. <br /> Kevin Lindley, Staff Engineer, said that this item was heard at the February 27, 2012 <br /> Quarterly Public Hearing. Subsequently, it went to the Planning Board and was heard at two <br /> meetings. The majority of the Planning Board's discussion of this item concerned the ability of <br /> using the viable repair area if a septic system failed. The original amendment to the UDO as <br /> presented at the QPH did not allow this circumstance. After the two Planning Board meetings, <br /> a unanimous recommendation was made that all new construction be required to connect to the <br /> public sewer service, but if someone has a septic system that fails, they would be given an <br /> option to use the viable repair area on their property or to connect to a public sewer system. <br /> Another issue that came forward at the Planning Board meetings was the definition that <br /> is part of the LIDO amendment for a public sewer service area. He read this definition: <br /> "An area located within Orange County's primary service area in the Water and Sewer <br /> Management Planning and Boundary Agreement that is currently served by public sewer or is <br /> expected to be served by public sewer in the near term." <br /> Commissioner Jacobs made reference to page 9, Section 6.20.1-C and asked it this <br /> was the change from the Planning Board and Kevin Lindley said yes. He said that this was <br /> something that he and Commissioner McKee brought up at the quarterly public hearing. <br /> Commissioner Jacobs made reference to item B on the same page and asked it was <br /> considered that this is a significant cost that would be incurred by property owners to have to <br /> put in a private sewage pumping station. Kevin Lindley said that pumping systems are more <br /> expensive than regular sewer systems. <br /> Commissioner Jacobs said that he wants to know the cost of this. Kevin Lindley said <br /> that it would probably be about $10,000. <br /> Frank Clifton said that there is a grinder pump system for single family homes that is not <br /> quite that expensive. <br /> Craig Benedict said that the gravity sewer system should pick up 90-95% of the <br /> properties in that area. <br /> Commissioner Yuhasz said that the County Commissioners had an email from a citizen <br /> about financial assistance in this issue. <br /> Commissioner Jacobs said that he would like to make a motion to direct staff to <br /> research having a fund for this kind of financial assistance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.