Orange County NC Website
.- 12 ,,I <br />Photocopying. Photocopying includes the cost of copying documents internally. <br />actin Plotting includes the cost of producing CADD drawings on bond, vellum, and mylar. <br />Vehicle Charge. Vehicle charge includes the cost for mileage on employee vehicles and company <br />vehicles. <br />SUPPLEMENTAL EXPENSES (unit rates) <br />CARD <br />Combustible Gas Monitor <br />Combustible Gas Meter <br />large Format Reproduction <br />Photocopying <br />Plotting: <br />Bond <br />Vellum <br />Mylar <br />Vehick'Charge <br />S 1250 per hour <br />S 60.00 per day <br />S 95.00 per day <br />S .15 per square foot <br />S .06 per copy <br />S ..65 per square foot <br />S .85 per square foot <br />S 1.00 per square foot <br />S 35 per Haile <br />WATER SAMPLING (in addition to labor and other expenses) <br />1. Sampling Crew Preparations. $100.00 per event <br />This includes coordination oty and preparations for a sampling event. Including <br />crew time spent on equipment maintenance, botticware and cooler preparations, and <br />restocking supplies. <br />2. Miscellaneous Supplies. <br />a. Gramdwater Samples (using JEI bailer) 530.00 per well <br />b. Groundwater Samples (using dedicated bailer) $20.00 per well <br />C. Surface Water and L.eachau Samples $20.00 per point <br />The miscellaneous supplies fee for sampling includes payment for expendable <br />items such as rubber gloves, lee, bailer tom and calibzatioa solutions_ This fee ako <br />covers the upkeep, maintenance, and depreciation of water k L pH, specific <br />conducdvhy. and tenTownie meters- The fee for use of a JL• I baikr iw%des time sp=t <br />on decontamination of the bailer and the expendable IN= associated with this <br />Pte- <br />February 2000 3 Joyce EngitteocLig, lac. <br />P1062516041 Rate Schedule <br />