Orange County NC Website
and the approved Reclamation Plan filed in accordance with Mining Permit #68 -02. In 73 <br />the event of any inconsistency between the Ordinan ce and the Mining Permit, the stricter <br />requirements shall control. <br />39. A security fence of at least 6' in height shall be installed around the entire circumference of <br />the pt and plant area. <br />40. Berms consisting of spoil and by products from operations shall be located as shown on the <br />approved site plan and shall not reach a height greater than 40' above the original contour <br />and shall not be graded so that the vertical slope exceeds the material's natural angle of <br />repose. <br />41. Applicants shall submit operational reports to the County Manager, or designee, on an <br />annual basis detailing the amounts of materials extracted, extent of extractive area, depth of <br />extractive area and ground water test boring to the County. <br />42. The petition to close existing Bethel Hickory Grove Church Road (SR 1104) shall not be <br />considered until the relocation and construction of the new SR 1104 is complete and <br />accepted by NCDOT. <br />43. Prior to submittal of the Bethel Hickory Grove Church Road (SR 1104) construction <br />drawings to NCDOT, the Orange County Erosion Control shall review and approve an <br />erosion control plan. <br />44. A 100 feet Type F buffer shall be retained/installed around the entire perimeter of the <br />petitioned site. <br />45. The travel width pavement of the relocated Bethel Hickory Grove Church Road (SR 1104) <br />shall be a minimum of 24 feet. In addition, on each side of the entire length of the road, 3- <br />foot, paved bicycle lanes shall be built in accordance with NCDOT specifications. <br />46. The ultimate right -of -way cross - section for NC 54 shall be 100 feet at its intersection with <br />relocated SR 1104. If the right -of -way is less than 100 feet, a dedication, in fee simple, of <br />fifty (50) feet from the centerline of the existing right -of -way, shall be made to the NCDOT. <br />Dedication shall be recorded prior to County Attorney approval of the Special Use Permit. <br />47. The existing American Stone driveway onto NC 54 shall be relocated to existing Bethel <br />Hickory Grove Church Road within two months after the opening of the relocated section of <br />Bethel Hickory Grove Church Road. <br />48. In cases of abandonment of termination of operations for a period of twelve (12) consecutive <br />months, application for a new Special Use Permit is required. <br />49. Two turn lanes (right turn lane and a center turn lane) on NC 54 shall be constructed or <br />bonded in accordance with NCDOT specifications prior to attorney approval of Special Use <br />Permit for recordation. <br />50. Prior to recording this special use permit, OWASA will record a conservation easement <br />naming Orange County as the grantee and, at the option of Orange County, naming an <br />additional grantee(s), in form satisfactory to the County Attorney, permanently restricting the <br />Isg: orangecounty \SpecialUsePermitResolution #2 (geg revisions 4- 10 -01) <br />