Orange County NC Website
Y <br />which money from this fund may be appropriated by Orange County are not limited to 69 <br />purposes within 3,000 feet of the perimeter of the quarry. OWASA will deposit $15,000 <br />annually to this fund until the year ending December 31, 2030 or until the year in which <br />extraction operations on the property terminate whichever first occurs. If there are any <br />funds remaining in this fund three years after the termination of extraction operations or <br />December 31, 2033, whichever first occurs, this fund will be terminated by Orange <br />County and the money remaining in the fund will be transferred into the County's general <br />fund. <br />15. Within two years of the issuance of this permit any property owner within a 3,000 foot radius <br />of the property encumbered by this permit may request American Stone Company to conduct <br />a pre -blast survey of structures on his or her property. An outside consultant selected and <br />paid for by American Stone with expertise in this field will perform the survey for the <br />purpose of documenting with photographs and other means the condition of the structure at <br />the time of the survey. The expert will provide a copy of the survey to the homeowner. <br />American Stone Company will, acting in good faith, accept responsibility for any damage <br />alleged to have occurred after the pre -blast survey where the pre -blast survey and blasting <br />data as determined by an expert indicate a probability but not a certainty that the damage was <br />caused by the activities of American Stone Company. <br />16. American Stone Company will maintain a notification directory of all neighbors living within <br />a 3,000 foot radius of the perimeter of the permitted property who request notification prior <br />to blasts. American Stone will attempt to notify each neighbor requesting notification of <br />planned blasts by telephone at the number provided by the neighbor at least 24 hours prior to <br />the blast. <br />17. Within two years of the issuance of this permit American Stone Company shall complete <br />the installation of baffling equipment in accordance with the guidelines and in general <br />conformance with the National Stone Association's Community Noise Manual for the <br />purpose of reducing plant noise. <br />18. American Stone Company shall continue its current "stemming" practices that were <br />implemented in 1997. This change represents an increase by 10% over prior levels of the <br />amount of "stemming material" used on the top two benches of the existing and expanded <br />quarry pit. <br />19. American Stone Company shall construct a 20' high berm, landscaped with grass and trees <br />as recommended in the National Stone Association's Community Noise Manual, between <br />the pit and relocated SRI 104 as shown on the submitted Plans for the purpose of <br />reducing noise in the buffer area surrounding the edge of the quarry. In- all instances, the <br />berm adjacent to the mine shall be expanded ahead of the mine expansion. <br />20. Prior to commencing blasting operations on the east side of the current location of SR 1104 <br />and in all events no later than three years from the date the issuance of this permit, <br />American Stone Company shall begin to enclose equipment used in the secondary portion of <br />the plant operations including the crushing and screening towers following the guidelines <br />and in general conformance with the National Stone Association's Community Noise <br />Manual and shall complete the enclosures within four years from the date the permits are <br />issued. <br />Isg: orangecounty \SpecialUsePermitResolution #2 (geg revisions 4- 10 -01) <br />