Orange County NC Website
Alternatives Analysis <br />Selection of Preliminary <br />Locally Preferred <br />Alternatives <br />P <br />U <br />0000. Scoping <br />L <br />L <br />C <br />Preliminary Engineering/ <br />Draft Environmental impact <br />Statement (PEIDEIS) <br />I <br />N <br />Final Selection o <br />V <br />Locally Preferred <br />Alternative <br />O <br />L <br />Preliminary Engineering/ <br />V <br />Final Environmental Impact <br />Statement <br />E <br />M <br />E <br />Environmental Record <br />of Decision <br />Final Design <br />Construction I <br />27 <br />Through the jointly adopted 2035 Long Range Transportation plan by the Durham - Chapel Hill - <br />Carrboro MPO (DCHC MPO) and the Capital Area MPO (CAMPO), transportation corridors in <br />greatest need of more detailed planning and analysis were identified. The Alternatives <br />Analysis (AA), completed in 2011, focused on a set of needs and alternative actions to address <br />these needs, and generated information needed to select an option for further engineering <br />and implementation. In February 2012, the DCHC MPO selected a 17.3 -mile light rail corridor <br />from East Durham to UNC Hospitals as the locally preferred alternative (LPA). Triangle <br />Transit, as the local project sponsor, will submit to FTA the New Starts project justification <br />and local financial commitment and request FTA's approval to enter into the preliminary <br />engineering (PE) phase of project development. <br />5/23/2012 - Page 127 <br />