Browse
Search
Agenda - 06-05-2012 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 06-05-2012 - Regular Mtg.
>
Agenda - 06-05-2012 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 12:26:46 PM
Creation date
6/1/2012 2:50:29 PM
Metadata
Fields
Template:
BOCC
Date
6/5/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 06-05-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-021 Ordinance Amending the Unified Development Ordinance regarding Rural Economic Development Area Conditional Zoning District
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lifestyles and <br />7 <br />4. Maintain present service levels for existing infrastructure. <br />3. Comprehensive Plan Linkaqe (i.e. Princinles_ Gnalc and nhin,-fi.,n�% <br />The Orange County 2030 Comprehensive Plan creates a mechanism through a <br />small area planning process to update and re- evaluate the document. Several <br />adopted small area plans have been adopted by the BOCC, including: <br />1. The 1991 Efland Area Study, <br />2. Stoney Creek Basin Small Area Plan, <br />3. Efland- Mebane Small Area Plan, and <br />4. NC Highway 57 Speedway Area Small Area Plan. <br />Small area plans allow the goals and objectives of the Comprehensive Plan to be <br />focused on a specific area or neighborhood. This process provides a foundation for <br />improving the Comprehensive Plan to facilitate needed changes, such as with the NC <br />Highway 57 Speedway Area Small Area Plan report putting forth the construct of <br />Rural Economic Development Area conditional zoning. <br />Land Use Overarching Goal: Coordination of the amount, location, pattern and <br />designation of future land uses, with availability of County services and facilities <br />sufficient to meet the needs of Orange County's population and economy consistent <br />with other Comprehensive Plan element goals and objectives. <br />Land Use Goal 9: Fiscally and environmentally responsible, sustainable growth, <br />consistent with the provision of adequate services and facilities and a high quality of <br />life. <br />Objective LU -1.1: Coordinate the location of higher intensity / high density residential <br />and non - residential development with existing or planned locations of public <br />transportation, commercial and community services, and adequate supporting <br />infrastructure (i.e., water and sewer, high -speed internet access, streets, and <br />sidewalks), while avoiding areas with protected natural and cultural resources. This <br />could be achieved by increasing allowable densities and creating new mixed -use <br />zoning districts where adequate public services are available. <br />Land Use Goal 2: Land uses that are appropriate to on -site environmental <br />conditions and features, and that protect natural resources, cultural resources, and <br />community character. <br />Obiective LU 2.4: Evaluate the development potential in rural crossroads <br />communities to identify whether current regulations permit appropriate development <br />that is in character with these communities, and whether potential development in <br />these areas would require significant expansions or cause depletions of public <br />services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.