Browse
Search
Agenda - 06-05-2012 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 06-05-2012 - Regular Mtg.
>
Agenda - 06-05-2012 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 4:18:18 PM
Creation date
6/1/2012 2:47:23 PM
Metadata
Fields
Template:
BOCC
Date
6/5/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 06-05-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-020 Proposed UDO Text Amendment: New Section 6.20: Public Sewer Connection
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Analysis <br />As required under Section 2.8.5 of the Unified Development Ordinance, the <br />Planning Director is required to: `cause an analysis to be made of the application <br />and, based upon that analysis, prepare a recommendation for consideration by <br />the Planning Board and the Board of County Commissioners'. <br />Orange County has committed to installing over $4 million worth of sewer <br />infrastructure in the Buckhorn and Efland communities. This sewer system extension <br />benefits public health because it allows a reliable alternative to septic systems, many <br />of which are failing or in poor condition. The sewer system also provides the <br />potential for economic development in these areas because growth and development <br />will not be limited by the wastewater capacity of the soil. However, to remain a viable <br />enterprise, the sewer system must have customers. The areas where sewer lines <br />have been extended are designated as growth areas and are generally situated <br />along major roads. In terms of a long range plan to encourage growth in these <br />designated areas, it makes sense to require any new construction to use the sewer <br />system. This was also recommended in the Efland- Mebane Small Area Plan, Section <br />IV.A.3.c. <br />3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) <br />1.3.6. SERVICES AND FACILITIES <br />Water conservation efforts have been a critical piece in managing water <br />supplies through recent droughts. County level coordination is needed to <br />manage water resources that will serve future populations. Placing public <br />water and sewer facilities near areas targeted for dense development can <br />reinforce a more sustainable land use pattern. <br />Section 8.3 Services and Community Facilities Goal 1: <br />Efficient provisions of public water and sewer service systems <br />which are consistent with the Land Use Plan and which abide by <br />the current Water and Sewer Management, Planning, and Boundary <br />Agreement (WASMPBA), the existing Orange County - Chapel Hill - Carrboro <br />Joint Planning Agreement and Land Use Plan, and future <br />agreements to be negotiated among the County and public and <br />private service providers. <br />Section 8.3 Services and Community Facilities Goal 2: <br />Adequate, safe, and healthy groundwater withdrawal and <br />wastewater disposal systems with minimal impacts upon water <br />and land resources. <br />Section 8.4.1.3. Objectives <br />Objective WW -2: <br />Coordinate the provision of potable water and sanitary sewer services <br />with the Orange County Land Use Plan and Orange County - Chapel Hill - <br />Carrboro Joint Planning Agreement and Land Use Plan, targeting <br />these services to urban, transitional, and economic development <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.