Orange County NC Website
5. Meet requirements in booklet attached as Exhibit A entitled: "SUNRISE <br />SPRINGS SUBDIVISION Revised submission to the Orange County Planning <br />Department November 17, 2000." <br />G. Certifications <br />A Certificate of Survey and Accuracy signed by a registered Land Surveyor shall <br />be notarized on the face of the Final Plat. <br />2. A Certificate of Declaration and Maintenance in the form provided in Section <br />V -D -6 -b of the Orange County Subdivision Regulations signed by the landowner <br />and developer shall be on the face of the plat and included in a document <br />describing development restrictions to be recorded concurrently with the Final <br />Plat. <br />3. The North Carolina Department of Transportation shall certify that Sunrise <br />Springs Road has been constructed to State standards or that construction plans <br />have been approved. <br />4. A Certificate of Approval signed by the Orange County Planning and Inspections <br />Department. <br />Signature of Applicant <br />Clerk to the Board <br />I, , accept the above listed conditions of subdivision approval, and <br />acknowledge that each must be met prior to recordation of the final plat. <br />Applicant Date <br />