Orange County NC Website
Delores Mason <br />336 McMasters St. Chapel Hill <br />942 -8913 <br />August 14, 2000 <br />ti <br />6 <br />r <br />7. Install 1/4 inch luan plywood. Prepare the floor for vinyl. <br />8. Install vinyl floor covering, metal trim and shoemold. Vinyl to cost not less than $14 /yd. <br />9. Paint the door and trim with semigloss latex paint. Paint to cover completely. Varnish the <br />paneling and trim with two coats of satin finish polyurethane. <br />BATH: <br />1. Install '/4 inch luan plywood. Prepare the plywood for vinyl. <br />2. Install vinyl floor covering, metal trim and shoemold. <br />3. Prepare the walls, ceiling and door for paint. Repair all damaged sheetrock tape. Paint the <br />walls, ceiling and door with semigloss, latex paint. Paint to cover completely. <br />LEFT/FRONT BEDROOM: <br />1. Remove the armoire and bureau to the dump. <br />2. Install vinyl replacement windows and trim. <br />3. Remove the existing carpet. Install `/4 inch luan plywood. Prepare the plywood for vinyl. <br />4. Install vinyl floor covering, metal trim and shoemold. <br />5. Paint the ceiling tile with ceiling white, latex paint, the new trim with <br />semigloss latex paint. <br />6. Remove the paneling and trim on the bath wall. Prepare the wall for a <br />plumbing box and drain. <br />7. Reinstall the existing trim and paneling. <br />